6. INSTALLATION / WIRING / COMMISSIONING
CAUTION
Risk of Electric Shock. All servicing should be performed by qualified service personnel. To reduce
the risks of electric shock disconnect power connections before servicing.
•
BT-PP20-A shall be mounted to a listed light fixture or electrical junction box or panel with an opening that can fit a
½” threaded nipple
•
Product must be installed in accordance with local electrical codes
•
Install device into place and fix into position using lock ring washer
•
For installation with field installed conductors of 60°C minimum rating.
•
The following wire connections are provided:
•
0-10V connection (violet / grey): #20AWG
•
Line Voltage/Relay connection (black / white / red): #14AWG
•
Connect wires as shown on diagram.
•
NOTE: for Emergency lighting, an Emergency Power Source (i.e. Generator / Battery Backup) that is capable
of maintaining 120VAC / 277VAC / 347VAC (depending on the application) for a MINIMUM of 30 minutes is
required.
•
Use appropriate sized wire-nuts to connect field installed conductors.
•
Download free Douglas Lighting Controls Smartphone App: BT-APP.
•
Commission as required
Emergency Test
•
The BT-PP20 Emergency operation can be tested using a Smartphone loaded with the free Douglas Lighting Controls
Smartphone App: BTCC.
•
To test Emergency operation, perform the following steps:
1. Ensure the emergency circuit is connected to the BT-PP20 and is energized.
2. Use the BTCC “Room Setup” function on the commissioning mobile device (eg. iPod) or use a Douglas Lighting
Controls Bluetooth switch to turn OFF the BT-PP20 under test.
3. Use the BTCC “System Setup” function on the commissioning mobile device to navigate to the commissioned
devices list and select the settings cogwheel for the BT-PP20 under test.
4. In the settings page for the BT-PP20, select the “Test Emergency Mode” button. The BT-PP20 will turn on to
100% brightness for approximately 30 seconds and then will return to its previous OFF state.
5. Use the “Cancel” button to exit the BT-PP20 Settings page WITHOUT saving the configuration parameters.
It is recommended to test devices configured for Emergency operation on a monthly basis.