UCI BioBidet BB-300H Скачать руководство пользователя страница 6

9

O P E R A T I N G   I N S T R U C T I O N S

OPERATION

STOP

HI

TEMP

HI

LO

LO

BB-300H

Made in Korea

10

O P E R A T I N G   I N S T R U C T I O N S

TRIAL OPERATION

1. Open the shutoff valve.
2. Plug in the power cord. The indicator will light up. Start supplying water to the water tank.
3. The water tank will take about a minute to fill up.

1. Shield the nozzle with your hand to prevent the water

from spraying too far during the trial operation.

2. Press the CLEANSING button to test the water stream.

3. Adjust the water stream using HI/LO button.

Confirm that there is no water leakage from the connections.

A. Preparation

CONTROL PANEL FEATURES

B. Operation Test

Press this button to stop
CLEANSING.

STOP BUTTON

Water pressure is adjustable
to the desired level by
pressing HI or LO button.

WATER PRESSURE

ADJUSTMENT BUTTON

The temperature of water is
adjustable to the desired
level by pressing TEMP
button. 

LED indicator lights
approximately correspond
to the following
temperatures:

WATER TEMPERATURE

ADJUSTMENT BUTTON

Pressing this button will
initiate the water stream for
one minute of personal
cleansing.

The 

Auto Shut-off

ensures

that the unit will not be left
“on” by accident.

LED indicator lights will
show the relative water
pressure and temperature
levels.

CLEANSING BUTTON

LED INDICATOR LIGHTS

C. Check for Water Leakage

Hose B

Branching Valve

Shutoff Valve

Open

Hose A

Flush Tank

SHS

Room Temperature

85

o

F

95

o

F

104

o

F

LO                           HI

Содержание BioBidet BB-300H

Страница 1: ...Operating Instructions BB 300H BioBidetTM Union Conception International Inc 205 Berg Street Algonquin IL 60102 U S A Phone 847 854 7292 Fax 847 854 1296 E mail uci biobidet com...

Страница 2: ...e cord away from heated surfaces 7 Never drop or insert any object into any opening or hose 8 Do not use outdoors where aerosol spray products are being used or where oxygen is being administered 9 Al...

Страница 3: ...630W Use wiring and electrical outlet appropriate for this level of power 8 Do not supply electrical power to the unit unless the plumbing work has been completed Damage could result 1 The electrical...

Страница 4: ...nd tighten You may need to use a valve coupling nut see note below 6 O P E R A T I N G I N S T R U C T I O N S INSTALLATION 1 Unfasten the nuts of the toilet seat to remove the toilet seat 2 Put the n...

Страница 5: ...ress the cleansing button to re initiate the water stream A Cautionary Notes 1 Turn the shutoff valve A clockwise to close 2 Loosen the drain B at the botton of the water tank to drain the water Be su...

Страница 6: ...CONTROL PANEL FEATURES B Operation Test Press this button to stop CLEANSING STOP BUTTON Water pressure is adjustable to the desired level by pressing HI or LO button WATER PRESSURE ADJUSTMENT BUTTON T...

Страница 7: ...k Shutoff Valve Strainer Nut A 12 O P E R A T I N G I N S T R U C T I O N S 1 Pull down the nozzle from the nozzle plate by hand 2 If the nozzle is clogged clean it using a pin B Cleaning the Nozzle C...

Страница 8: ...e Warranty Excludes the Following 1 Replacement of parts due to discoloration from cleaning chemicals or mineral content in water If you live in an area with strong minerals in the water manufacturer...

Отзывы: