![Ubiquiti TS-5-POE ToughSwitchPoE Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/ubiquiti/ts-5-poe-toughswitchpoe/ts-5-poe-toughswitchpoe_quick-start-manual_3262117006.webp)
4
TOUGHSwitch
™
PoE Quick Start Guide
Hardware Installation
Mount the TOUGHSwitch on a wall or place it on a bench top.
Note:
Keep 20 mm of clearance next to the ventilation
holes for adequate airflow.
Installation Requirements
• Drill, 6 mm drill bit, and Phillips screwdriver (wall-mounting)
• For outdoor applications, shielded Category 5 (or above) cabling
should be used for all wired Ethernet connections and should be
grounded through the AC ground of the power supply.
We recommend that you protect your outdoor networks from
the most brutal environments and devastating ESD attacks
with industrial-grade shielded Ethernet cable from Ubiquiti
Networks
™
. For more details, visit www.ubnt.com/toughcable
Wall-Mounting
To mount the TOUGHSwitch on a wall:
1. Use a 6 mm drill bit to drill two holes 60 mm apart.
2. Insert the M2.9 Anchors into the holes.
3. Use a Phillips screwdriver to secure a M2.9x20 Screw to each
anchor. Leave a clearance of approximately 3 mm between
each screw head and its anchor.
60 mm
3 mm
Note:
You can also mount the TOUGHSwitch in a
horizontal orientation.
Содержание TS-5-POE ToughSwitchPoE
Страница 1: ...5 Port Power over Ethernet Managed Switch Model TS 5 POE...
Страница 2: ......
Страница 19: ......