Mark
Top-of-bracket Line
Measure The Distance Of Two Wall Bracket
1
2
3
4
5
6
7
8
Installation of bracket
1 Identify all parts packed in carton
against the parts list. Remove all
protective material. Place parts on
non-abrasive surface to avoid scratches.
Do not attempt assembly if any parts are
missing or damaged.
2. Find an appropriate place over 2.5m to
the floor or ground for assembling the
awning on the wall and place a mark.
3. Draw a line on the wall with a ruler
according to the mark. It will be the
top-of-bracket line (the line must be
horizontal). This is to say, this line might
not be parallel with other structural lines,
such as siding, etc.
4. Locate where wall brackets are to be
installed and mark. The brackets must be
assembled onto the wall vertically.
Parts List
For awnings up to a size of 3 metres, 2 brackets (part no. 2) are included. From 3.5 metres
and upwards, there are three brackets.
The quantities of parts 3 to 8 depend on whether there are 2 or 3 brackets.
The installation should be carried out by professional!
Warning! Incomplete fasteners will weaken the product strength and cause potential danger.
1
handhook
2
2 or 3 brackets
3
6 or 9 bolts
4
6 or 9 plugs
5
4 or 6 bolts
6
6 or 9 washers
7
6 or 9 nuts
8
6 or 9 washers
9 awning
9
Содержание 77805028
Страница 1: ......