Fig. 8:
Attach the slanted beam (K1) and middle beam (K2) to the top connector (J) with bolts (AA) and washers (BB).
Fig. 9:
Attach the lower side of the slanted beam (K1) to the post (A) with bolts (DD), washers (BB), and nuts (EE).
Fig. 10
: Attach the lower side of middle beam (K2) to top bar connector (H) with screws (DD), washers (BB) and nuts (EE).
Fig. 11
: Attach the lower side of top short beam 1 / top short beam 2 (L1/L2) to the middle beam (K2) with screws (FF) and
washers (BB).
Hardware Pack 2
Part
Description
Quantity
Image
AA
M6X20 bolt
16
BB
M6 washer
96
DD
M6X55 bolt
16
EE
M6 nut
16
FF
M6X15 screw
48
Fig. 7:
Attach the triangle support (D) to each post (A)
and roof bar with bolts (HH) and washers (BB).