
Step
F
:
Step
G
:
Step
H
:
Step
I
:
9
8
Cover the marked space with mortar.
Cut a round hole for the drain.
Place base on mortar, making sure
the drain hole is perfectly aligned.
Make sure the base is level.
Step
J
:
Step
K
:
Fix the base to the wall with screws( ).
1
.
Continued
1
.
Continued
1
.
Continued
1
.
Continued
4
7X
ST4
*
40
Ref
4
3.2mm(1/8")
Drill seven holes in the middle of base lip, on both sides.
Holes should be aligned with wall studs.