Fig.1:
Attach stake cover (C) to post (A), then fix stake plate (B) and
Post (A)
with
bolt (AA) and flat washer
(BB)
.
Fig.2:
Fix up Lower slanting beam connector (I) which inserted into Post (A) with bolt (AA) and flat washer
(BB).
Fig.3:
Insert Valance 2(E) into Valance 1 (D), then fix up with bolt (CC) flat washer and flat washer(BB) and
nut (GG), then cover bolt (CC).with plastic cover(HH).
Fig.4:
Lock assembled valance to post (A) with bolt (DD) and flat washer (BB) ,then cover bolt(DD)with
plastic cover(HH).