RT-2087/ZPX-A User and Installation Guide
UAV-1005667-001 Rev A
ECCN 7A994
Page 35 | 48
10.3 Post-Installation Checks
Post-installation checks must be performed by the installer, after
configuration, as appropriate for the aircraft and type of installation.
To ensure compliance with civil regulations in the United States, verify
functionality identified in 14 CFR Part 43 Appendix F (ATC Transponder
Tests and Inspections) and 14 CFR Part 43 Appendix E (Altimeter System
Test and Inspection).
Aircraft with ZPX-A installed may be subject to requirements in 14 CFR
91.215, 91.225 and 91.227. For additional details reference §5.10.
A complete post-installation check may be performed by using a ramp
tester such as a VIAVI IFR6000. A simplified post-installation check
procedure follows.
STEP
CHECK
Launch the
Ping200X Control & Config
Windows Application
(v3.27 or later)
Set Port to the USB or serial port connected to the ZPX-A
Set the
‘App Baud’ to ‘57600’
Set
‘Protocol’ to ‘UCP’
•
If the ZPX-A has been reconfigured for a protocol other
than UCP, this procedure may not apply
Connect the Antenna PRIOR TO APPLYING POWER
Apply power from a minimum of an 11V, 1A power source
Press ‘Start’ in ‘
P
ing200X Control & Config’
Windows
application
Confirm activity in ‘Serial Activity Viewer’ and incrementing
‘Pkts’ in ‘Packet Statistics’ of ‘Control’ tab
Verify ‘ICAO Address’ in ‘Ownship Display’ is correct for your
aircraft, and not ‘000000’