UAV-1004045-001 AV-30-C ICA
21
Revision A
8 Post-Installation Test Procedures
Refer to
AV-30-C Installation Manual
for Post-Installation Checks to be
performed after removal and re-installation.
9 Troubleshooting
Refer to
AV-30-C Installation Manual
for trouble shooting procedures.
10 Return to Service Procedure
After removing and re-installing or replacing the AV-30-C, perform the
setup and configuration procedures in the
AV-30-C Installation Manual
.
11 Maintenance Records
After conducting the test and service procedures as defined in this
document, the aircraft may be returned to service.
Record the following information in the appropriate aircraft maintenance
logs.
Part number and serial number of the unit that was replaced or
re-installed.
Any other applicable information related to the maintenance
work performed on the aircraft.
Appendix A includes an installation record that should be completed and
updated as appropriate with every maintenance action.
12 Support
For additional questions or support please visit:
http://www.uavionix.com/support/