U.S. Boiler Company PVG Скачать руководство пользователя страница 3

3

Basic Operation

A.

 General.

 This water boiler utilizes fan-assisted 

combustion and is equipped with controls for proper 

operation. All controls must be in proper working order. 

Contact a qualified service agency to provide annual 

maintenance as specified in Installation, Operating and 

Service Instructions.

1.

 Limit

  See Figure 1. A device which automatically 

interrupts boiler operation when the water 

temperature exceeds the set point. Maximum 

allowable boiler water temperature is 220°F. Switch 

differential is 15°F.

  Original equipment with this boiler is U.S. Boiler 

Intelligent Hydronic Control and Limit Rated 

Temperature Sensor combination. The Intelligent 

Hydronic Control shuts off boiler main burners 

when boiler water temperature exceeds pre-

programmed Intelligent Hydronic Control water 

temperature set point.  Boiler main burners will 

re-light automatically, providing the call for heat is 

present, when boiler water temperature falls below 

pre-programmed control water temperature set point 

less the set point differential.

2.  Flame Rollout Switch.

 See Figure 1. A device 

which automatically interrupts boiler operation 

when flames or excessive heat are present in the 

combustion area enclosure. The control is a single 

use device.  The control is located in the combustion 

area enclosure.   If the control was activated to 

interrupt boiler operation, do not attempt to place 

boiler in operation. Contact a qualified service 

agency.

WARNING

Service on this boiler should be undertaken only 

by trained and skilled personnel from a qualified 

service agency.

3.   Pressure Switch.

 See Figure 1. A device which 

automatically prevents or interrupts boiler 

operation when the induced draft blower fails to 

move sufficient combustion air for proper burner 

operation. Boiler operation resumes automatically 

when sufficient combustion air flow is reestablished.

4.  Electronic Ignition System.

 The Electronic Ignition 

(EI) System consists of:

a.  a solid state ignition control with integral 

ignition module to initiate, monitor and stop 

burner operation.

b.  a combination gas valve to regulate gas flow to 

the burners. See Figure 1.

c.  a pilot burner to provide the ignition source for 

the main burners.  See Figure 4.

B.

 Instructions

 to place the boiler in operation and to turn 

off the boiler are shown on the Operating Instruction 

Label posted on the left jacket panel of the boiler. The 

Operating Instruction Label is shown in Figure 2.

C.

  The Sequence of Operation

 is shown in Figure 3.

CAUTION

Should overheating occur or the gas supply fail to shut off, do not turn off or disconnect the electrical 

supply to the pump. Instead, shut off the gas supply at a location external to the appliance.

En cas de surchauffe ou si I'admission de gaz ne peut être coupée, ne pas couper ni débrancher 

l'alimentation électrique de la pompe.  Fermer plutôt le robinet d'admission de gaz à l'extérieur de I'appareil.
Do not use this boiler if any part has been under water. Immediately call a qualified service technician to 

inspect the boiler and to replace any part of the control system and any gas control which has been under 

water.

Содержание PVG

Страница 1: ...les instructions donn es dans cette notice pour r duire au minimum le risque d incendie ou d explosion ou pour viter tout dommage mat riel toute blessure ou la mort Ne pas entreposer ni utiliser d es...

Страница 2: ...e RCF parts or attempt any service or repair work involving RCF without wearing the following protective gear 1 A National Institute for Occupational Safety and Health NIOSH approved respirator 2 Long...

Страница 3: ...ice on this boiler should be undertaken only by trained and skilled personnel from a qualified service agency 3 Pressure Switch See Figure 1 A device which automatically prevents or interrupts boiler...

Страница 4: ...4 Figure 1 Control Locations A Intelligent Hydronic Control B Transformer C J Box Power Harness D Limit Rated Temperature Sensor Well E Pressure Switch F Blower G Gas Valve H Flame Rollout Switch...

Страница 5: ...5 Figure 2 Operating Instructions...

Страница 6: ...n Source Off Main Gas On Call For Heat Ends Standby Intelligent Hydronic Control can display typical Delay 60 Seconds Ignition Source Off Pilot Gas Off Main Gas Off Blower Off Circulator Output De Ene...

Страница 7: ...Inspect Pilot and Main Burner Flames Monthly 1 Remove jacket front panel 2 View flames through burner access panel See Figure 1 3 Adjust thermostat to highest setting 4 Check pilot flame See Figure 4...

Страница 8: ...through your local U S Boiler Wholesale distributor Should you require assistance in locating a U S Boiler distributor in your area or have questions regarding the availability of U S Boiler products...

Отзывы: