background image

28

VIII.  OPERATION (continued)

E.

  ChANGING ThE AdJUSTABLE PARAMETERS

 

To adjust parameters such as high Limit Setpoint and 

high Limit differential:
1.  Access the adjustment mode by pressing and 

holding the Up 

ñ

, down 

ò

, and 

I

 keys 

simultaneously for three (3) seconds.  This 

procedure is intended to discourage unauthorized 

changes or accidental changes to limit settings.

2.  Press the 

"

I

"

 key to display available Adjustment 

Mode options. Select an option.

Adjustment mode Options

HL_

140-220°F

Adjust High Limit Setting

dF_

10-30°F

Adjust High Limit Differential

Or_

0-10 minutes

Circulator Overrun Time 

PP_

2-20 minutes

Circulator Pre-purge Time 

St_

140-180°F

Start Temperature

Pt_

On

 or 

off

Priority time

dh_

dh

 or 

tt2

DH Terminal Function

rst

Reset Lockout

f-C

F

 or

 C

Select degrees F or C Mode

bac

Back to Operating Mode

3.  Press the Up 

ñ

 and down 

ò

 keys to adjust the 

displayed item to the desired value.

4.  To return to the normal operating mode from the 

Adjustment Mode, when the "

bAc

” option is 

displayed, press either the Up 

ñ

 or down 

ò

 key.  If 

no keys are pressed, after five (5) minutes the 

control will automatically return to the Operating 

Mode.

F.

  MORE INFORMATION ABOUT AdJUSTABLE 

PARAMETERS 
1.  high Limit (

HL_

)

  The control is factory programmed with a high 

Limit Setpoint of 180°F.  The burner turns "off" 

when the boiler water temperature (

bt

) is above this 

value.  The high Limit setpoint is adjustable 

between 140° and 220°F.  The Operating Setpoint 

(

SP

) will equal the high Limit Setpoint.

2.  differential (

df_

)

  The control is factory programmed with a 

differential of 15°F.  The differential is the number 

of degrees the boiler temperature must decrease 

below the Operating Setpoint before the boiler can 

restart.  The differential is adjustable between 10° 

through 30°F.

3.  Circulator Overrun Time (

OR_

)

  The control is factory programmed with a Circulator 

Overrun Time of 0 minutes.  Circulator Overrun 

Time (also called “circulator off delay” or 

“circulator post purge”) continues circulator 

operation after a call for heat has ended, sending 

excess heat from the boiler into the system.  Ensure 

system piping and zone panel settings allow water 

flow to the priority zone after the call for heat ends.  

The  Circulator Overrun Time is adjustable between 

0 through 10 minutes.

4. Circulator Pre-purge Time (

PP_

)

  When the boiler is warm (boiler water temperature 

higher than 140°F (adjustable using Start 

Temperature parameter)) and there is a thermostat 

call for heat, the system circulator is started and 

boiler firing is delayed Circulator Pre-purge minutes.  

If the temperature drops below 140°F or there is a 

dhW call for heat the boiler is started without 

delay.  Additionally, the boiler is started without 

delay if the thermostat call for heat is initiated when 

the boiler water temperature is less than 140°F.  This 

feature helps save energy by satisfying home heating 

needs with residual boiler heat rather than cycling 

the boiler.  The Circulator Pre-purge time has a 

factory setting of 2 minutes and is field adjustable 

between 2 and 20 minutes.  Refer to Table 7.

Call for 

Heat 

Source

DHW 

Terminal 

Selection

Boiler 

Temperature

Burner Status

TT = on

-

<140

Start with no delay

TT = on

-

>140

Start after 2 minute delay

DHW = on

tt2

<140

Start with no delay

DHW = on

tt2

>140

Start after 2 minute delay

DHW = on

dh

<140

Start with no delay

DHW = on

dh

>140

Start with no delay

Table 7:  Circulator Pre-purge Time example,

               (

PP_

 = 2 minutes)

5. Start Temperature (

St_

)

  Amount of “heat available”  is calculated by taking 

the difference between measured boiler water 

temperature and the Start Temperature setting.  

Useful “heat Available” is dependent on the type of 

heating emitter installed in the home.  heat emitters 

require a certain minimum temperature to operate 

effectively.  Our default settings reflect cast iron 

radiators.  Fan Coils may require a start temperature 

setting of 180°F or 160°F before providing heat to 

the home. The Start Temperature has a factory 

setting of 140°F and is field adjustable between 

140°F and 180°F.

6. Priority Time (

Pt_

)

  When the Priority Time parameter is set to “on”  and 

domestic hot Water (dhW) call for heat is “on” the 

dhW demand will take “Priority” over home 

heating demand. during Priority Time the system 

circulator will be forced “off”.   Priority Time ends 

and the system circulator is released to service home 

heating demand when domestic hot Water call for 

heat is over.  When Priority Time parameter is set to 

“Off” the dhW call for heat does not force “off” the 

Содержание B series 2

Страница 1: ...i t a e h r u o y l l a c r e l i o b o t s r i a p e r r o e c i v r e s r o F l e b a L g n i t a R n o n w o h s s a r e b m u N l a i r e S d n a r e b m u N l e d o M r e l i o B e d i v o r p r...

Страница 2: ...ct to be installed by a Licensed Plumber or Gas Fitter The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important...

Страница 3: ...should be installed on the heating system to prevent damage if the boiler is inoperative This boiler contains very hot water under high pressure Do not unscrew any pipe fittings nor attempt to disconn...

Страница 4: ...Parts 39 AppendixA Figures 56 Appendix B Tables 58 The Series 2 boilers are low pressure cast iron gas fired hot water boilers designed for use in closed hot water heating systems These boilers are Ca...

Страница 5: ...1 2 9 1 4 6 48 1 2 9 3 4 5 1 4 1 2 4 7 6 dia 354 206 29 3 4 21 3 4 10 7 8 6 48 1 2 9 3 4 5 1 4 1 2 5 5 6 dia 414 207 33 25 12 1 2 7 50 1 8 10 3 8 6 5 8 3 4 6 2 7 dia 458 208 36 1 4 28 1 4 14 1 8 7 50...

Страница 6: ...t etc DANGER Do not install boiler where gasoline or other flammable vapors or liquids or sources of hydrocarbons i e bleaches cleaners chemicals sprays paint removers fabric softeners etc are used or...

Страница 7: ...ir infiltration through cracks around windows and doors vi For boiler located in building of unusually tight construction provide outdoor air through two permanent openings which communicate directly...

Страница 8: ...for natural gas shall be such as to provide the required supply of gas without undue loss of pressure between meter and the boiler Gas supply piping should be sized in accordance with the Tables 2 3 a...

Страница 9: ...large volume or excessive radiation where low boiler water temperatures may be encountered i e converted gravity circulation system etc Install a pipe tee at the boiler return along with a second tee...

Страница 10: ...10 IV Boiler Water Piping continued Figure 5 Recommended Water Piping for Zone Valve Zoned Heating Systems...

Страница 11: ...11 IV Boiler Water Piping continued Figure 6 Recommended Water Piping for Circulator Zoned Heating Systems...

Страница 12: ...ff is required to protect a gas fired hot water boiler when any connected heat distributor radiation is installed below the top of the hot water boiler i e baseboard on the same floor level as the boi...

Страница 13: ...Water Piping continued Figure 9 Recommended Auxiliary Limit Location C Optional Auxiliary Limit Installation 1 Some jurisdictions may require the use of an Auxiliary Limit control with a hot water bo...

Страница 14: ...the draft hood skirt by locating the center tooth with the 10 sheet metal screw on the outside and the other two teeth inside the draft hood skirt See Figure 10 4 Slide the mounting bracket up tight a...

Страница 15: ...ovided 4 x 3 vent reducer into vent damper outlet then install vent connector from reducer outlet to chimney 2 All other sizes Install vent connector from vent damper outlet to chimney 3 Install vent...

Страница 16: ...nte montante est d au moins 1 4 po par pied 21 mm m entre la chaudi re et l vent 10 Support horizontal portions of venting system to prevent sagging Use pipe straps brackets or hangers spaced 4 ft 1 2...

Страница 17: ...senter des risques V Venting continued 3 Dans la mesure du possible fermer toutes les portes et les fen tres du b timent et toutes les portes entre l espace o les appareils toujours raccord s au syst...

Страница 18: ...cal circuit must be run from the main electrical service with an over current device disconnect in the circuit A service switch is recommended and may be required by some local jurisdictions When inst...

Страница 19: ...19 Figure 13 Connection Wiring Diagram Intelligent Hydronic Control VI Electrical continued...

Страница 20: ...20 Figure 14 Ladder Wiring Diagram Intelligent Hydronic Control VI Electrical continued...

Страница 21: ...21 Figure 15 Wiring Schematic Zone Valves Figure 16 Wiring Schematic Zone Circulators VI Electrical continued...

Страница 22: ...At completion open all zone valves i Close hose bib continue filling the system until the pressure gauge reads 12 psi Close fill valve Note If make up water line is equipped with pressure reducing val...

Страница 23: ...23 Figure 19 Operating Instructions VR8204 and VR8304 Gas Valves VII Start up and Checkout continued...

Страница 24: ...t Adjust regulator on Gas Valve so that manifold pressure is three and a half 3 inches water column Turning Regulator Adjusting Screw Clockwise increases pressure Counterclockwise rotation decreases p...

Страница 25: ...nne Start boiler refer to instructions on damper to determine if damper is in the full open position I CHECK IGNITION SYSTEM SAFETY SHUT OFF DEVICE Remove 3 wire plug from gas valve If burners do not...

Страница 26: ...atus information to help determine the cause of the problem Table 6 provides a list of boiler status codes that are reported Refer to the Troubleshooting Section for more information C Using Display T...

Страница 27: ...s the below listed values This list is also available on the control cover Status Code Displayed in STA Mode 1 Standby 4 Prepurge 6 Spark 7 Flame Proving 8 Running 10 Retry Recycle Delay 13 Soft Locko...

Страница 28: ...water flow to the priority zone after the call for heat ends The Circulator Overrun Time is adjustable between 0 through 10 minutes 4 Circulator Pre purge Time When the boiler is warm boiler water te...

Страница 29: ...d Heating Zone When there is no IWH the DHW Circulator output may be configured to control a second heating zone This is particularly helpful when the home uses only two heating zones The control repl...

Страница 30: ...respirator 2 Long sleeved loose fitting clothing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clo...

Страница 31: ...ccumulation of soot To obtain access to flueways 1 Remove vent pipe damper blocked vent switch and draft hood 2 Remove sheet metal screws securing Jacket Top Panel lift panel and rotate about relief v...

Страница 32: ...ll out switch wires gas valve wires and pilot lead 4 Check main burner and Pilot flames see procedure in Section VII Start up and Checkout paragraphs D and E E Check all controls and damper operation...

Страница 33: ...t bracket 3 To adjust or check spark gap between electrode and hood on Honeywell Q3481B pilot a Use round wire gauge to check spark gap b Spark gap should be 1 8 inch for optimum performance 4 Reinsta...

Страница 34: ...e replacing a component try to rule out all other possible causes 5 When checking voltage across wiring harness pins be careful not to insert the meter probes into the pins Doing so may damage the pin...

Страница 35: ...c is present unplug the vent damper harness from control With wire harness unplugged check for 24Vac between P6 5 on Control and ground If voltage present replace the control If voltage not present fa...

Страница 36: ...llow the recommendations in Section I Figure 1 and Section V Venting Check Flame Rollout Switch in the event of excessive blockage of the boiler section flue passageways is developed the flame rollout...

Страница 37: ...ng for recommended corrective action Flame sensed during post purge before gas valve signaled open Check the gas valve for proper operation Replace gas valve is problem persists Hard Lockout When a ha...

Страница 38: ...low check the following 24 volts across PV and MV PV at gas valve if voltage ok replace defective gas valve Check for break in wiring harness to gas valve 24 volts across control connector P5 2 and P5...

Страница 39: ...ntrols 54 Draft Hood and Vent Damper 55 All Series 2 Repair Parts may be obtained through your local U S Boiler Company Wholesale distributor Should you require assistance in locating a U S Boiler Com...

Страница 40: ...40 Section Assembly and Canopy Group XI Repair Parts continued...

Страница 41: ...tinued Key No Description Part No Quantity 202 202X 203 204 205 206 207 208 209 210 2 Canopy Group 2A Canopy Assembly 61117022 1 611170300 1 611170302 1 611170402 1 611170502 1 611170602 1 611170702 1...

Страница 42: ...0391 1 204 718600491 1 205 718600591 1 206 718600691 1 207 718600791 1 208 718600891 1 209 718600991 1 210 718601091 1 Key No Description Boiler Size Part No Qty 3 Base Assembly Continued 3B Base Wrap...

Страница 43: ...37 1 204 71806047 1 205 71806057 1 206 71806067 1 207 71806077 1 208 718600806 1 209 718600906 1 210 718601006 1 Key No Description Boiler Size Part No Qty 3 Base Assembly Continued 3E Base Leg Assemb...

Страница 44: ...44 Manifold and Main Burners 1 Inch Main Burners XI Repair Parts continued...

Страница 45: ...2 2 2 2 Screw Machine Philips Head w Captive Lockwasher 10 32 x 1 4 Electronic Ignition 80860874 1 1 1 1 1 1 1 1 1 1 4F Screw Self Tapping Philips Pan Head 1 4 20 x 1 2 80860700 4 4 4 4 4 4 4 4 4 4 4B...

Страница 46: ...arts continued Key No Description Part No Quantity 203 202X 204 205 206 207 208 209 210 4 40 MM Main Burners Only 4A Main Burner 8236135 1 1 2 3 4 5 6 7 8 4B 40 MM Main Burner with Pilot Bracket 4B Ma...

Страница 47: ...41 822729 N A 2 3 40 822728 4 5 6 7 8 9 4D 40 MM Main Burner Orifices LP Gas 5001 9000 Ft USA Only 4D 54 822734 N A 2 53 822722 3 4 5 6 7 8 9 4D 40 MM Main Burner Orifices Natural Gas 2001 4500 Ft Ca...

Страница 48: ...60161 1 1 1 1 5G Ground Wire Assembly 103776 01 1 1 1 1 1 1 1 1 1 1 5H Compression Fitting 1 4 OD x 1 4 CC Honeywell 386449 1 B 8236109 1 1 1 1 1 1 1 1 1 1 5 Pilot Burner and Gas Valve LP Gas 5A Pilot...

Страница 49: ...t Assembly Complete 6 Jacket Assembly Complete 604170254 1 604170354 1 1 604170454 1 604170554 1 604170654 1 604170754 1 604170854 1 604170954 1 604171054 1 6 Jacket Assembly 6A Jacket Wrap Around Pan...

Страница 50: ...50 XI Repair Parts continued Jacket Assembly...

Страница 51: ...33 1 604170733 1 604170833 1 604170933 1 604171033 1 6D Jacket Front Removable Door 604170242 1 604170342 1 1 604170442 1 604170542 1 604170642 1 604170742 1 604170842 1 604170942 1 604171042 1 6E Jac...

Страница 52: ...52 Water Trim XI Repair Parts continued...

Страница 53: ...6170 1 8B Gasket Taco 00 Series 806602006 2 9 Miscellaneous Circulator Hardware 9A Flange 1 1 4 NPT 806602013 2 9B Screw Cap Hex Head 7 16 14 x 1 1 2 80861301 4 9C Nut Hex 7 16 14 80860406 4 10 Limit...

Страница 54: ...Flame Rollout Switch 80160044 1 13B Flame Rollout Switch Mounting Bracket All Models Except 202 7186018 1 14 Blocked Vent Switch Replacement Assembly 6016058 1 15A Intelligent Hydronic Control Honeyw...

Страница 55: ...202 202X 203 204 205 206 207 208 209 210 16 Draft Hood Carton 16 Draft Hood 8116067 1 1 1 8111702 1 8111703 1 1 8111704 1 1 8111705 1 1 17 Vent Damper 17 4 102284 01 1 1 1 5 102284 02 1 6 102284 03 1...

Страница 56: ...nstallation Figure 12 16 Typical Vent Installation Section VI Electrical Figure 13 19 Connection Diagram Schematic Intelligent Hydronic Control Figure 14 20 Ladder Diagram Schematic Intelligent Hydron...

Страница 57: ...pair Parts N A 40 Section Assembly Canopy Group N A 42 Base Assembly N A 44 Maniflold Main Burners 1 inch Main Burners N A 46 Manifold Main Burners 40mm Main Burners N A 48 Pilot Burner Gas Valve N A...

Страница 58: ...r Pre purge Time example PP_ 2 minutes Table 8 29 DHW Terminal function dh_ Selection Domestic Hot Water Demand Parameter dh_ dh Table 9 29 DHW Terminal Function dh_ Selection Zone Request Parameter d...

Страница 59: ...59...

Страница 60: ...60 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...

Отзывы: