
USER GUIDE
u-line.com
Integrated Panel Installation
Integrated Panel Installation
Cut and prepare panels according to the information
provided in the Integrated Panel Dimensions section.
It is important to use the factory provided grille that came
with the product to assure proper air flow is maintained
through the condenser. The use of a custom grille is not
recommended and will void the warranty.
REMOVE DOOR
See Door Adjustments section.
ASSEMBLE THE PANEL TO THE DOOR
1.
With the door laying on a flat
surface and starting at the corner
of the door, remove the magnetic
door gasket from the interior side
of the door. Set the gasket aside
on a flat surface.
2. Align the panel to the door. Make sure the sides and
top are flush.
3. With bar clamps or “C” clamps, secure the panel to
the door
4. At each of the 10 holes in the gasket extrusion
channel, drill pilot holes into the wood panel. Use
the drill size from the chart in the table below being
careful not to drill through the front surface of the
panel.
5. Fasten the panel to the door with the 10 screws
provided in the literature pack.
6. Remove the clamps and replace the gasket in the
gasket extrusion channel. Some force may be required
to seat the gasket into the channel. Be sure the
gasket corners are seated correctly.
INSTALL THE DOOR
See Door Adjustments section.
CAUTION
!
Wood
Panel
Door/Drawer
Bar
Clamp
Bar
Clamp
Integrated panel
flush with top of
door.
Integrated panel
flush with side of
door.
Holes in gasket
extrusion channel
Material Type
#10 Wood Screw
Hardwood
1⁄8
” (3.2mm) Diameter Pilot Hole
Softwood
7⁄64
”
(2.8mm) Diameter Pilot Hole
14