U-Line H-6513 Скачать руководство пользователя страница 8

PAGE 8 OF 9 

0217 IH-6513

WIRING DIAGRAM

Control PCB

Power Lamp 

(LED)

Thermostat 

(Temp. Control)

Photocell

Green

Green

Black

CN2

CN2

CDS

R-TH

Black

Power 

Switch

Power 

Plug

AC 120 

V 60Hz

Limit 

Control

Ignitor

Pump 

Motor

Black

Black

Black

Black

Spark Plug

White

White

White

White

Green

Earth

Earth

Earth

Yellow

Capacitor 

20uF/250 VAC

Pink

Orange

Motor 1

Motor 2

ACIN 2

*Blue

ACIN 1

Fuse 

8A/125 AVC

Electric 

Outlet

Black

Black

Black

Room 

Sensor

Содержание H-6513

Страница 1: ...WARNING Fire burn inhalation and explosion hazard Keep combustibles such as building materials paper or cardboard a safe distance away from the heater Never use the heater in spaces which contain prod...

Страница 2: ...s For outdoor use Indoor use permitted only for the temporary heating of adequately ventilated buildings or structures under construction alteration or repair Provide at least a three square feet open...

Страница 3: ...60Hz AMPS 2 3A 2 7A PHASE Single Single Fuel Tank Lamp Drain Plug Power Cord Side Cover Fuel Cap Fuel Gauge Lower Shell Hot Air Outlet Front Handle Upper Shell Rear Handle Fan Guard Side Cover Digita...

Страница 4: ...crews are secure 7 Attach rear handle with two 50 mm screws and two nuts through the third hole from the rear of the heater on either side See Figure 2 NOTE You will secure the rear handle in step 10...

Страница 5: ...soning Use heater only in well ventilated areas Refer to Safety Warnings on pages 1 and 2 for information about carbon monoxide poisoning DANGER Carbon monoxide poisoning may lead to death Always prov...

Страница 6: ...E To order parts call Uline Customer Service at 1 800 295 5510 Follow a maintenance schedule as follows FUEL FUEL TANK Flush tank every 200 hours of operation as needed NOTE Follow the long term stora...

Страница 7: ...ng season or more depending on conditions See Figure 11 PUMP PRESSURE 1 While heater is operating turn adjusting screw clockwise to increase counterclockwise to decrease pressure See Figure 12 2 Corre...

Страница 8: ...k CN2 CN2 CDS R TH Black Power Switch Power Plug AC 120 V 60Hz Limit Control Ignitor Pump Motor Black Black Black Black Spark Plug White White White White Green Earth Earth Earth Yellow Capacitor 20uF...

Страница 9: ...sure Clean or replace spark plug Adjust plug gap as necessary Clean or replace fuel filter Clean or replace nozzle Rinse fuel tank with clean fresh kerosene Inspect all electrical connections See wiri...

Отзывы: