U-Line H-3797 Скачать руководство пользователя страница 2

PAGE 2 OF 2 

0313 IH-3797

NOTE: If the desired platform height is between 

6' and 11' 6" additional unit is required.

WARNING! When stacking second unit, 
outriggers and guardrails are required. Do not 
stack more than 2 units high. All scaffolds must 
be restrained from tipping. 

1.  Install caster (E) into outrigger (C) and secure with 

snap pin (D). Repeat for remaining 3 outriggers.  

(See Figure 4)

2.  Install outriggers (C) by clamping to end frames 

perpendicular to the side braces. Clamps must be 

tight and casters must make contact with the floor. 

Set caster brakes. (See Figure 5)

3.  Install end frames of upper unit onto end frames 

of the base unit. (See Figure 6) Insert 4 snap pins 

to secure scaffold units. Attach 2 side braces 

to upper end frames at desired platform height. 

Place platform so that it is fully seated and level in 

both side braces. Be sure the deck pins are in the 

engaged position.

4.  Install guard rail panel into side brace sockets and 

secure with lock pin. (See Figure 7) Guard rail gate 

must swing inward above platform. Repeat for other 

side. 

WARNING! Guard rail gate must swing inward 
above platform. Make sure each scaffold 
level has both side braces installed. Follow all 
applicable ANSI and OSHA guidelines along 
with local codes for the use of this product. 

Outrigger

End

Frame

Tighten

Side

Brace

Socket

Snap

Pin

PARTS FOR STACKING ADDITIONAL UNIT

ASSEMBLY INSTRUCTIONS FOR STACKING ADDITIONAL UNIT

#

DESCRIPTION

QTY.

A

Guard Rail Panel/Gate

2

B

Lock Pin

4

C

18" Outrigger

4

D

Snap Pin

4*

E

5" Caster

4*

*From additional unit.

A

C

B

E

D

Figure 4

Figure 6

Figure 5

Figure 7

π

  CHICAGO • ATLANTA • DALLAS • LOS ANGELES • MINNEAPOLIS • NYC/PHILA • SEATTLE • MEXICO • CANADA

1-800-295-5510

uline.com

Отзывы: