U-Line H-1075 Скачать руководство пользователя страница 1

PAGE 1 OF 12 

0615 IH-1075

π

  H-1075

20" VACUUM SEALER

1-800-295-5510

uline.com

SAFETY PRECAUTIONS

To insure safe operation, the operator should be familiar 

with the pinch points and a possible burn hazard near 

the seal jaw area. Warning stickers mark the location of 

these hazards.

Do not wear neckties, jewelry or loose clothing when 

operating the sealer.

Do not operate, troubleshoot or maintain the sealer 

under the influence of any drug or alcohol.

Always observe all safety warnings and notices on the 

machine and in this manual.

DO NOT use flammable or toxic cleaning fluids such as 

gasoline, benzene or ether.

CAUTION! Keep hands, fingers and flammable 
objects out of the seal jaw area. If a foreign 
object is caught between the jaws, turn main 

power switch to OFF immediately to prevent 
possible burns.

CONTROLS

MAIN POWER SWITCH – Turns power off and on.

FOOT SWITCH –

 

Controls vacuum cycle and initiates  

seal cycle.

HEAT TIMER – Controls heating time. To increase heat, 

turn heat timer knob clockwise. To decrease, turn knob 

counterclockwise. Timer is set in seconds – 10 seconds 

maximum.

COOL TIMER – Controls amount of time that pressure 

bar remains closed for cooling. To increase cool time, 

turn cool timer knob clockwise. To decrease, turn knob 

counterclockwise. Timer is calibrated in increments of 

1/10 minute. 

LED INDICATORS ON HEAT/COOL TIMERS:

•  UNLIT: Timer is not active. 

•  SOLID COLOR: Timer is active. 

•  FLASHING: Timer has timed-out.

OVERVIEW

Para español, vea páginas 5-8.

Pour le français, consulter les pages 9-12.

Содержание H-1075

Страница 1: ...le objects out of the seal jaw area If a foreign object is caught between the jaws turn main power switch to OFF immediately to prevent possible burns CONTROLS MAIN POWER SWITCH Turns power off and on...

Страница 2: ...ing cycles 6 Continuously monitor seal area If the area overheats lower heating time and increase cooling time 7 At the end of each shift or production run turn sealer OFF by pressing the Main Power S...

Страница 3: ...eflon cover and EPA s insulated backing under the element Replacement is necessary if burns bubbles or other surface defects are present 4 Also check the Pressure Bar for burns and replace if necessar...

Страница 4: ...nsure they are tight with no gaps Ensure all contact surfaces are clean If burnt out replace fuse No Cool Check bag Increase cool time Bag Sticks to Seal Jaw Check the Pressure Bar Replace if necessar...

Страница 5: ...ue el interruptor de energ a principal inmediatamente para evitar posibles quemaduras CONTROLES INTERRUPTOR DE ALIMENTACI N PRINCIPAL Enciende y apaga la electricidad INTERRUPTOR DE PIE Controla el ci...

Страница 6: ...idos 6 Vigile la zona de sellado constantemente Si la zona se sobrecalienta reduzca el tiempo de calentamiento y aumente el tiempo de enfriamiento 7 Despu s de cada turno o ciclo de producci n apague...

Страница 7: ...erso aislante de EPA colocado debajo de la resistencia Ser necesario reemplazarlos si muestran quemaduras burbujas u otros defectos en la superficie 4 Revise tambi n si hay quemaduras en la barra de p...

Страница 8: ...seg rese de que todas las superficies de contacto est n limpias Si se ha fundido reemplace el fusible No enfr a Revise la bolsa Aumente el tiempo de enfriamiento La bolsa se adhiere a la mordaza de se...

Страница 9: ...est pris entre les m choires placez l interrupteur d alimentation principal en position OFF arr t imm diatement pour viter d ventuelles br lures COMMANDES INTERRUPTEUR D ALIMENTATION PRINCIPAL teint e...

Страница 10: ...age et de refroidissement pr d finis 6 Surveillez constamment la zone de scellage Si la zone surchauffe diminuez le temps de chauffage et augmentez le temps de refroidissement 7 la fin de chaque p rio...

Страница 11: ...onMD et la doublure isol e de l EPA sous l l ment Il sera n cessaire de le remplacer s il y a pr sence de br lures de bulles ou d autres d fauts sur la surface 4 V rifiez galement la barre de pression...

Страница 12: ...s surfaces de contact sont propres S il est br l remplacez le fusible Aucun refroidissement V rifiez le sac Augmentez le temps de refroidissement Le sac reste coll sur la m choire de scellage V rifiez...

Отзывы: