
28
User’s Manual
7. Reconnect inlet and outlet lines to the water valve.
8. Replace front access panel.
9. Replace grille.
10. Drain water from the water trough and drain line by removing the
overflow tube (see Figure 27).
11. Clean the ice maker and storage bin before next use.
12. Prop door open to allow for air circulation and prevent mold and
mildew.
Содержание ECHELON CLR2060
Страница 1: ...4 0 9540 3 0 0 9 0 5 o m c h e l o n U S E R M A N U A L...
Страница 2: ......
Страница 35: ...d ass ts g e s nd es in e f the Line a or he es ges mis ter ng ly 0 be e in be g es or n t er...
Страница 36: ...n...