20
servicing anD mainTenance
Servicing and maintenance
5
Maintenance and servicing table
Befor
e star
ting up
On finishing work
W
eekly
Annually
If faults occur
If damage occurs
Wire saw
• Tighten loose screws and nuts
X
X
X
Guide rail
• Clean guide bearing surface
X
X
X
Drive and guide rol-
lers
•
Check rollers for wear
X
X
X
X
•
Check bandages for wear
X
X
X
X
•
Check bearings
X
X
X
• Clean
X
X
X
Feed cylinder
•
Check for cleanliness / damage
X
X
X
X
Drive motor
•
Check for cleanliness / damage
X
X
X
X
Connectors, cables,
couplings
•
Check for cleanliness / damage
X
X
X
X
Water economy
•
Check the water pipes/hoses are
clean and for leaks
X
X
X
• Blowing out water
X
Diamond wire
• Clean with water
X
•
Check for wear
X
X
X
X
Service
• To be performed by TYROLIT
Hydrostress AG or an authorized
workshop
After 100/300/500/700 hours
Содержание WCE30
Страница 1: ...Index 000 OPERATING INSTRUCTIONS WCE30 Translation of the originalinstructions 11002237 en 29 03 2020...
Страница 7: ...Assembly 7 Assembly Diamond wire storage unit 3 3 1 1 A 2 3 B 4 5 C...
Страница 25: ......
Страница 26: ......