background image

11 

 

3. 

Assembly  and initial preparation for operation

 

 

 

3.1 

Assembly  tools

 

 

• Combination wrench size 13/46

 

 

3.2 

 Setup

 

 

Danger!  • Put the saw on a clean and horizontal ground

 

• Press the parking brake (ltem  15)

 

 

3.3 

 Installation of the saw blade (or checkinq the installation)

 

 

Notice!  • High adjustment must be tighten

 

• Water hose coupling is open

 

• Remove the hexagon bolt

 

• Turn the saw hood forward on the table

 

• Remove the flange nut (left-hand thread) and thrust washer 

.

 

 

 

ATTENTION!  When installing the saw blade, observe the following:

 

• All receptacle surfaces must be clean

.

 

• Rotation direction arrow on the saw blade must match the one on the hood

.

 

• Use only diamond saw blades intended by the manufacturer.

 

 

• lnstall thrust washer and flange nut. (Combination wrench size 13/46)

 

• Turn back the saw hood

 

• Fix the saw hoos with the hexagon bolt

 

• Close the water hose coupling

 

 

3.4 

 Saw preparations

 

 

• Fill the pan with water until the pump is submerged.

 

• Open the water valve.

 

• Plug the supply line cable (400 VI 32 A) 

into 

the socket (item 8)

.

 

• Check protective equipment (see 2.2)

    • Switch the main switch (item 3) to “I ON”.

 

 

 

 

3.5 

 Test direction of rotation of the saw blade

 

 

• Turn Star delta switch (item 1) to “star”. 

• Press button start (item 2). 

• Turn star delta switch (item 1) to “0”.

 

• Check the direction of rotation of the saw blade.

 

The direction of rotation is clockwise, seen from the left  

(direction arrow on the saw hood)

.

 

Содержание TME1000P

Страница 1: ...Operating manual Spare parts list Stone cutoff saw TME1000P Index 001 10997855 EN I 25 04 2019...

Страница 2: ...ake technical changes without prior notice Copyright 2014 TYROLIT Hydrostress AG CH 8330 Pf ffikon ZH Switzerland All rights reserved in particular copyrighting and translating rights Printing of this...

Страница 3: ...e location where the machine is used The operating manual must be read and used by any person assigned tasks with the machine such as operation including set up repair of malfunctions during operation...

Страница 4: ...ating manual and be fully aware of the safety requirements and hazards posed by the machine In particular any faults that may compromise safety must be repaired immediately 1 3 Organisational measures...

Страница 5: ...nspections The machine must be inspected annually by an expert 1 3 12 The machine must be thoroughly cleaned before inspection Danger 1 3 13 The power cord must be unplugged before all inspection or r...

Страница 6: ...ions each day check the following condition of the diamond saw blade cracked saw blades must be replaced when in doubt by an expert functional condition of the safety devices adequate cooling water su...

Страница 7: ...alled and checked immediately upon completion of the maintenance and repair work 1 5 2 8 Dispose of fuel and consumable materials and replacement parts in a safe and environmentally friendly manner 1...

Страница 8: ...l stop points for load carrying devices etc by means of the lifting gear in a workmanlike manner Danger 1 7 4 Use only suitable transport vehicles with sufficient lifting capacities Danger 1 7 5 Secur...

Страница 9: ...2 Fixingpoints ltem 13 Water pan ltem14 Forklifttakingup ltem 15 Parking brake ltem16 Lockingofsawarm Item 17 Hour meter 2 2 Protective equipment ltem 4 Saw hood 2 3 Technical data Motor power Current...

Страница 10: ...12418 Therefore it was used a standard saw blade 900 mm not a silent blade Parameter Value continuoussound pressure level at work LoA 91 dB A Sound power level LwA 106 dB A Sound power level at the ea...

Страница 11: ...saw blade must match the one on the hood Use only diamond saw blades intended by the manufacturer lnstall thrust washer and flange nut Combination wrench size 13 46 Turn back the saw hood Fix the saw...

Страница 12: ...star delta switch item 1 to star Press button start item 2 Wait untill the motor has a regular revolution regular sound Turn the star delta switch further to delta ATTENTION ls the saw blade adequate...

Страница 13: ...ansport with the forklift Take up the saw with the forklift item 14 5 Operation 5 1 Setting up the saw Set up the saw on a clean and stable foundation All three wheels must have a grounding contact Pr...

Страница 14: ...th height over 380 mm in the reversing tool Performing the height adjustment Attention Position the saw arm locking Pos 16 horizontal Motor is turned off Loosen the clamping lever item 7 Set the saw h...

Страница 15: ...lf there is danger of freezing take the water pump out of the water and run it until empty ATTENTION Frozen pumps have to be thawed out before switching them on Transport see 4 7 Maintenance Thoroughl...

Страница 16: ...rection Motor incorrectly polarised Reverse the phase inverter Motor shuts down during sawing but can be restarted after a short break Feed too fast Saw blade blunt Saw blade worn coating 2 mm Cut wit...

Страница 17: ...17...

Страница 18: ...18...

Отзывы: