![TYROLIT Hydrostress CCE25 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/tyrolit-hydrostress/cce25/cce25_operating-instructions-manual_1187167007.webp)
TYROLIT
Hydrostress AG
Page 7
CCE25 / CCH25
Assembly Description
Step A
X
Secure central tube (1) with at least two M12 bolts and drive-in location dowels
X
Locate rotating tube (2) from below in the central tube
Step B
X
Bolt rotating tube (2) to gearbox plate and gearbox (4)
X
Push the diverter roll tube (3) from above through the central tube and bolt to the gearbox
plate
Step C
X
Assemble cruciform member (5) (Note mounting position)
X
Mount extension arm (6)
Step D
X
Mount diverter rolls (7) and (8)
X
Bolt down tensioning unit (9)
Step E
X
Bolt guide roller units (10) and (11) to extension arm tubes
X
Insert diamond wire (12) and tension over tensioning unit (9)
X
Mount diamond wire guard (13)
DANGER
To secure the wire saw appropriate sub-surface anchoring elements should be used. When po-
sitioning the dowels the installation instructions of the dowel manufacturer must be followed.
Example: TYROLIT instructions for dowel M12x50
Содержание CCE25
Страница 21: ...TYROLIT Hydrostress AG Page 21 CCE25 CCH25...