![typical TW7-6BR Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/typical/tw7-6br/tw7-6br_operation-instruction-parts-book_1187103005.webp)
6.Installing the presser foot lift control plate(Fig.3)
7.Installing the belt guard(Fig.4)
8.Installing the bobbin winder (Fig.5)
2
3
4
5
Frist, the chain hook A should be connected with the
chain B and presser foot lift lever C, then put the
pedal assembly D on the stand, move the control
plate E leftward or rightward until the chain
becomes on one line, tighten the bolts and nuts,
finally, connect the chain hook to the control plate.
For the safety purpose, the belt guard should be
installed as the Fig 4 shown.
A
B
C
D
E
Align pulley B of the bobbin winder with the
outside of the V-belt C, and there should be a proper
clearance between them, so that pulley B can be
touched with the V-belt when latch thumb lever A is
depressed, thereby the V-belt can drive the pulley B
while the machine running. The bobbin winder
should be parallel with belt slit E of the table, finally
fasten two wooden screws D.
.
A
D
B
C
E
C