background image

71-0145  

Page 8 

07/29/18 

Rev. 01 

Step 9. 

Remove heater mounting plate from the back of the heater. With the 1” screws provided 

with the heater, fasten the heater mounting plate to the wood brackets. The upper left screw 
(closest to the wall) should be 5” from the wall and 24-3/4” from the floor. Then put the two 
lower screws in the holes. Then hang the heater on the heater mounting plate. 
 
After mounting the heater, connect the large wire from the sauna heater to the blue connector on 
the back wall. Connect the smaller wire from the heater to the right side wall.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 

Step 10.

 Ensure all connections are completed. Plug the cord from the back of your room to a 

15 or 20 amp 120 volt dedicated outlet.  
 
 

 

Содержание IS 44 BT

Страница 1: ...ation 9 IS 44 Room Operation 9 Infrared Sauna Tips and Tricks 11 Troubleshooting and Maintenance 12 Please record the serial number here Sauna Heater __________________ Sauna Room __________________ K...

Страница 2: ...sure to elevated temperatures is capable of inducing hyperthermia Hyperthermia occurs when the internal temperature of the body reaches several degrees above the normal body temperature of 98 6 F The...

Страница 3: ...p about 4 inches 10cm higher than the panel with the button Refer to Picture 1 place the panel against the panel with button Refer to Picture 2 and then slide the panel with button down until the two...

Страница 4: ...na floor surface you many need to use wood interlocking the two wall panels shims to assist with leveling Shims together repeat for the other side are not provided Then place the back wall wall on the...

Страница 5: ...lace the heater inside of the room Final installation of heater in Step 8 Step 4 Connect the two black junction boxes located on the lower left and right wall corner R1 to the Right wall L1 to the Lef...

Страница 6: ...r in front of the benches Step 7 Front wall and ceiling installation Place the front wall in the slot in the floor Lift each corner to slide and lock into place This step will require two people Then...

Страница 7: ...9 18 Rev 01 Step 8 Connecting the wires in the ceiling Back compartment connections Connect 6 to 6 Connect B to B Connect 5 to 5 Connect 4 to 4 Connect C to C Right Side Wall above Sensor Front compar...

Страница 8: ...e 5 from the wall and 24 3 4 from the floor Then put the two lower screws in the holes Then hang the heater on the heater mounting plate After mounting the heater connect the large wire from the sauna...

Страница 9: ...not chosen press the appropriate system NOTE You can only operate one heating system at a time Note Once the desired type of heat is chosen follow the Setting the Time and Setting the Temperature sec...

Страница 10: ...he display of room temperature is not important The key is the room should feel warm upon entry after approximately 15 20 minute heat up Infrared energy heats objects not the air When the body is plac...

Страница 11: ...dry surface Supply voltage should be a nominal of 120 volts AC 20 Amp House wiring gauge size should match the amperage of the product being used Keep the length of wiring run from the breaker panel t...

Страница 12: ...irculate the heat in the room more evenly resulting in a more consistent heat throughout the sauna TROUBLESHOOTING SECTION Room Questions No Heat Control is delay mode Ensure system is not in the dela...

Отзывы: