
2
Qwik Install
STEP 1:
Prepare a foundation to provide level support for the enclo-
sure.
STEP 2:
Place enclosure on the foundation. Install 8 batteries in the
box. Use a rope tied to the battery tabs to lower batteries into the box.
Connect all 8 batteries in series configuration for either 24VDC or
48VDC (See Wiring Diagram Below and near the end of this booklet)
STEP 3:
Install DIN rail adapters to the
60A MPPT Battery Charge Controller.
STEP 4:
Install DIN rail to enclosure
using the two screws provided. Install
MPPT battery charge controller to DIN
Rail.