45° SHIELDS G4 WITH DRAKA CABLE
411-15684
Rev. O
4 to 4
2.3. Procedure for crimping the two shield legs.
Important
:
This step has to be done after crimping the ferrule on the Connect
Systems tool number ‘391-1’ (see picture 6,7, 8).
Picture 6
Picture 7
Picture 8
When crimping the two shield legs, upper and lower shield must be positioned in
order to close the gap between shields.
After the two legs crimping the allowed remaining front gap for both connector side
must be less than 0.2mm as shown on picture 9 and picture 10.
Picture 9
Picture 10
Left Connector Side
Right Connector Side
Front Gap