
59
Rack Mounting the Server
1. Pull the middle rail fully extended in lock position, ensure ball bearing
retainer is located at the front of the middle rail.
2. Horizontally insert the chassis into middle-outer rails. When hit a stop,
please pull/push the blue release tab on the inner rails.
3. Tighten chassis with shipping screws.
Содержание TS75A-B8252
Страница 1: ...TS75A B8252 Service Engineer s Manual...
Страница 14: ...14 http www tyan com NOTE...
Страница 35: ...35 http www tyan com 1 5 3 System Top View...
Страница 37: ...37 http www tyan com 1 5 4 Chassis Dimensions...
Страница 61: ...61 http www tyan com NOTE...
Страница 81: ...81 http www tyan com NOTE...
Страница 88: ...88 http www tyan com 7 Secure the two rotary screws 8 Reconnect the GPU power cables to the bracket...
Страница 91: ...91 http www tyan com 5 2 Block Diagram S8252 Block Diagram...
Страница 92: ...92 http www tyan com 5 3 Motherboard Mechanical Drawing...
Страница 109: ...109 http www tyan com 4 Secure the OCP 3 0 card to the chassis 5 The OCP 3 0 card to the chassis has been completed...
Страница 113: ...113 http www tyan com BIOS Temp Sensor Name Explanation...