19
7.
Locate the Pin 1 indicator of the package. Align the package with the
socket and carefully insert the package into the socket with vertical
motion only. Vertically check if the CPU is seated well in the socket
housing. If not, take out the CPU, with vertical motion only, and
repeat the above steps.
NOTE
: The alignment keys must be located in the notches of the package.
8.
Close the socket. Rotate the load plate onto the package lid.
Engage the load lever while pressing down lightly onto the load plate.
Secure the lever near the hook end under the retention tab.
9.
Repeat this procedure for the second processor if necessary.
Attention!
1. TYAN recommends that reengaging the PnP cap after operating or
testing, whenever the package is not in the socket.
2. Please note that the cap must be replaced when returning the MB to
TYAN for repair service. Failure to do so will void your warranty and
may cause damage to the board.
Содержание Thunder n3600W S2935
Страница 4: ...4 NOTE...
Страница 9: ...9 2 2 Block Diagram Thunder n3600W S2935 Block Diagram...
Страница 72: ...72 NOTE...