http://www.tyan.com
25
2.7 - Heatsink Installation Procedures
Type A: CAM LEVER (TYPE) INSTALLATION
1. After placing backplate and
interface material under motherboard
place heatsink retention frame on top
of motherboard. Align plastic retention
bracket screw holes with CPU back-
plate standoffs.
Tighten screws to secure plastic
retention bracket. Repeat for the other
side.
DO NOT OVER TIGHTEN.
2. After tightening screws secure
metal clip to plastic retention bracket
center tab. Repeat for the other side
of heatsink.
3. After securing metal clip to plastic
retention bracket center tab, push
down on plastic clip to lock plastic clip
to side tab.
Содержание S3870
Страница 4: ...http www tyan com 4 NOTE...
Страница 8: ...http www tyan com 8 NOTE...
Страница 11: ...http www tyan com 11 2 2 Block Diagram Tiger K8SSA S3870 Block Diagram...
Страница 14: ...http www tyan com 14 J6 J22 J2 JP6 J3...
Страница 16: ...http www tyan com 16 J20 J19 J24 J4 J32 JP1...
Страница 18: ...http www tyan com 18 JP5 J2 JP3 J18 J26...
Страница 20: ...http www tyan com 20 J33...
Страница 40: ...http www tyan com 40 NOTE...
Страница 82: ...http www tyan com 82 NOTE...
Страница 86: ...http www tyan com 86 NOTE...