http://www.tyan.com
21
2.7 - Heatsink Installation Procedures
Type A: CAM LEVER (TYPE) INSTALLATION
1. After placing backplate and
interface material under motherboard
place heatsink retention frame on top
of motherboard. Align plastic retention
bracket screw holes with CPU back-
plate standoffs.
Tighten screws to secure plastic
retention bracket. Repeat for the other
side.
DO NOT OVER TIGHTEN.
2. After tightening screws secure
metal clip to plastic retention bracket
center tab. Repeat for the other side
of heatsink.
3. After securing metal clip to plastic
retention bracket center tab, push
down on plastic clip to lock plastic clip
to side tab.
Содержание S2895
Страница 6: ...http www tyan com 6 NOTES...
Страница 9: ...http www tyan com 9 2 2 Block Diagram S2895 Thunder K8WE Block Diagram...
Страница 14: ...http www tyan com 14 P23 J69 J14 P29...
Страница 16: ...http www tyan com 16 FAN4 FAN3 FAN2 CPU1 Fan CPU2 Fan FAN1...
Страница 26: ...http www tyan com 26...
Страница 34: ...http www tyan com 34 NOTES...