
18. Connect The Heating Plate Wire and Y Axis End stop Wire
连接热床线和Y轴限位线
19. About the Thermistor Wire and Heating Cube Wire
关于热敏电阻线和加热棒线
Picture 1
:
Connect
①
with
②
and
connect
③
with
④
图 1: 将
①
和
②
连接, 将
③
和
④
连接
Line A is the thermistor cable to hot end. A线是热端的热敏转接线
The heating tube wires are already connected. 加热棒的黑红电线已对接好(此线不分正负)
①
②
③
④
①
②
Picture 2: Connect
①
with
②
图 2: 将
①
和
②
连接
1
2
SP-5
19
TWOTREES
Содержание SP-5
Страница 1: ......
Страница 2: ......
Страница 9: ...1 Install the Standing Feet 安装脚垫 Turn Over 反转过来 Foot Pad 脚垫 x4 M4 12 Screw 螺丝 x4 SP 5 4 TWOTREES ...
Страница 11: ...3 Install The Beams 安装横梁 M5 30 Screw 螺丝 x4 SP 5 6 TWOTREES ...
Страница 12: ...4 4 Install The Roof 安装顶部 Machine Roof 机器顶部 x1 M5 10 Screw 螺丝 x8 M5 16 Screw 螺丝 x8 SP 5 7 TWOTREES ...
Страница 20: ...Teflon Tube 四氟管 x 1 M4 8 Screw 螺丝 x 1 Wire Clip 线夹 x 1 12 Fix The Teflon Tube 固定四氟管 SP 5 15 TWOTREES ...
Страница 31: ......