- 23 -
6. MAINTENANCE
6-1. Inspection
⚫
Inspect the LCR meter at regular intervals so that it maintains its initial performance for a long time.
⚫
Check the input power cord for damage of the vinyl cover and overheating of the plug and cord stopper.
Check the terminal screws and binding posts for loosening.
6-2. Fuse Replacement
Step
1)
Take off the power cord and remove the fuse socket using a minus driver.
2)
Replace the fuse in the holder.
Fuse rating: T1.0/250V for 110Vac input, T0.5/250V for 220Vac input.