TS-1800 Site Preparation Guide
Page 3
1
About This Guide
The information and requirements provided in this document ensure proper installation
and operation of the Twine TS-1800 Digital Thread Dyeing system. The customer is
responsible for:
Preparing the site as described in this document.
Complying with all applicable local regulations.
Filling out and signing the Site Preparation Checklist.
Sending the Site Preparation Checklist to your Twine representative.
If you have any questions about the information in this document, contact your Twine
representative.
All site preparation requirements must be met before the installation date.