2
ASSEMBLY INSTRUCTIONS
The T
WIN
E
AGLES
Charcoal Grill is produced fully assembled and tested in the factory and requires no major
assembly in the field. For the purpose of safe shipping and transit, some parts are wrapped inside the grill and
require minor assembly.
! WARNING !
Check to ensure that all packaging material has been removed prior to grill operation.
TO INSTALL THE CRANK HANDLE
1.
Open the front access door and locate the nut on the
inside right hand behind the front panel.
2.
Slide the threaded part of the crank handle through
the hole on the front panel and screw it into the nut
inside the firebox body.
WARMING RACK
Install the warming rack as shown.
When the warming rack is not in use, it may be moved out of the
way by sliding it out forward towards the front of grill.
Optional Rotisserie Kit
(Note: can be installed on either left side or right side)
1.
Install the rotisserie motor as shown. (See fig. 1) The motor socket hole will line up with the hole on the
side of the rear hood.
2.
Insert the hex end of the rotisserie rod through hole on right hand side of the rear hood. (See fig. 2)
3.
Then insert the rotisserie rod into to the motor socket hole. (See fig. 1)
NUT
FRONT ACCESS
DOOR
CRANK
FIG. 1
FIG. 2
FIG. 3