![TV Bedstore ANNECY Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/tv-bedstore/annecy/annecy_aassembly-instructions_1182965012.webp)
Electrical & Cable Connections
Page 12 of 20
10
Step
TV Power Lead
supplied with your TV
Step
11
Bed Assembly
13
13
IMPORTANT
: Be careful to keep the two
HDMI Leads (17) on top of the Base Boards
.
Main power lead (15) and
Aerial lead (16) should be kept under the base boards & fed out under the headboard so you can connect to your wall
sockets.
16
Press the “DOWN” button once
to lower TV Lift to the bottom.
STOP
UP
DOWN
19