Towel Warmer Installation Procedure
Rough-in Requirements - for dedicated heating system
(see figure 2)
1
fig. 2
Using this installation method, the towel warmer is controlled using the thermostat wired to the circulator pump, and
cannot be operated independently from the heating system. This method of installation is popular where there is only
one heating appliance connected to a closed hot water heating system, and electronic control of the individual towel
warmer is required.
1. Install heating system pipework to proposed towel warmer location. Piping to towel warmer valves should be 1/2”
copper.
2. If towel warmer supply pipes are coming through wall, rough-in pipes as per locations shown on fig 4. If towel warmer
supply pipes are coming through floor, rough-in pipes as per locations shown on fig 7.
3. If a hydronic installation pack is being used (see figs 5 & 8), these should be connected (solder connected) within the
wall / floor. If a hydronic installation pack is not being used (see figs 6 & 9), these 1/2” copper supply lines should
protrude through wall/floor in order to connect to towel warmer valves.
4. Wall studs or plywood backing is required in the wall at bracket locations. See figure 4 for bracket locations.
4