![Tuxedo LR-26-PAD Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/tuxedo/lr-26-pad/lr-26-pad_assembly-and-operation-instruction-manual_1182857013.webp)
IMPORTANT
POWER UNIT PRIMING PROCEDURE
THE PROBLEM: Power unit runs fine but will not pump any fluid.
Step 1 – Locate the check valve, the flush plug to the left of the lowering valve.
(See drawing below.)
Step 2 – Using an Allen wrench and shop towel – with shop towel in place to catch
fluid – loosen the check valve plug 2 ½ turns to allow it to leak.
Step 3 – Push the START button for one second, then release for three seconds.
Repeat these steps until unit starts pumping fluid.
Step 4 – Tighten the check valve plug.
YOUR POWER UNIT SHOULD BE PRIMED
Содержание LR-26-PAD
Страница 2: ...LR 26 PAD 6000 lb Capacity Low Rise Pad Lift ASSEMBLY OPERATION INSTRUCTION MANUAL REV A 090413 ...
Страница 3: ......
Страница 10: ...9 LIFT PARTS DRAWING AND PARTS CODE LIST 161106 Fig 1 0100 FRAME Fig 18 REV A 090413 ...
Страница 12: ......