background image

7

fillrite.com  |  tuthill.com

INSTALLATION AND OPERATION MANUAL

Your Fill‑Rite pump nozzle can be pad locked to the pump for added security. With the 
pump turned off, and the nozzle in the stored position, a pad lock can be inserted 
through the locking link and the nozzle handle opening. This configuration prevents 
the nozzle from being removed from the nozzle boot.
The locking link is located on the nozzle side of the pump, and can be pivoted into 
position to work with the nozzle listed on the barrel label of your NX25‑120 or 
NX25‑240 pump. Use the appropriate position and hole to lock your nozzle securely 
to your NX25‑120 or NX25‑240 series pump.

Operating Instructions 

1.  Remove dispensing nozzle from nozzle boot.
2.  Move the switch lever to the “ON” (raised) position to start the motor. The pump should 

start and settle into a slow idle.

3.  Insert the dispensing nozzle into the container to be filled.
4.  Operate the nozzle to dispense fluid; release nozzle when the desired amount of fluid 

has been dispensed.

5.  Move switch lever to the “OFF” (lowered) position to stop the motor.
6.  Remove the dispensing nozzle from the container being filled and store it 

in the nozzle boot.

CAUTION!

 Always keep the nozzle in contact with the container 

being filled during the filling process to minimize the possibility 
of static electricity build up. 

IMPORTANT! 

The motor has power at all times when connected to a power 

source. The switch does not apply or interrupt power to the motor. High 
voltage may still be present inside the pump after power is removed.

Pump Switch Lever

OFF

ON

Pad Locking 

 

Содержание nextec FILL-RITE NX25-120 Series

Страница 1: ...MADE IN USA NX25 120 NX25 240 SERIES AC FUEL TRANSFER PUMPS Installation and Operation Manual ...

Страница 2: ...r the foregoing warranties will be limited to either at Manufacturer s option replacing defective goods subject to limitations hereinafter provided or refunding the purchase price for such Goods theretofore paid by the buyer and Buyers exclusive remedy for breach of any such warranties will be enforcement of such obligations of the Manufacturer If the Manufacturer so requests the return of such Go...

Страница 3: ... this entire manual prior to attempting to install or operate your new pump Become familiar with the terms and diagrams and pay close attention to the highlighted areas with the following labels At Tuthill your satisfaction with our products is paramount to us If you have questions or need assistance with your product please contact us at 1 800 634 2695 M F 8 AM 6 PM ET Safety Information DANGER E...

Страница 4: ...water IMPORTANT A Fill Rite filter should be used on the pump outlet to ensure no foreign material is transferred to the fuel tank Foreign material can damage the equipment being fueled WARNING A static electric spark can occur when filling portable containers sitting on truck bed liners or on any vehicle s carpeting or floor matting This spark will explosively ignite a gasoline vapor fire and cau...

Страница 5: ...0 pumps comes from the factory ready to install an anti siphon tube back to the tank An anti siphon device a k a vacuum breaker is important because it will break a liquid siphon if there is an open nozzle or a leaking hose below the fluid level in the tank when the pump is turned off Fill Rite recommends anti siphon kit KIT321ASN be installed from the pump outlet back to the vapor space in the ta...

Страница 6: ...onnection is NPT threading 3 Fold the wires back into the junction box and replace the cover making sure the cover gasket is in place Torque fasteners to 44 in lbs with 4mm hex key IMPORTANT Be certain the gasket for the cover is in place and the screws draw the cover down tight over the junction box There must be no gap between the junction box and it s cover Electrical Wiring WARNING Electrical ...

Страница 7: ...ensing nozzle from nozzle boot 2 Move the switch lever to the ON raised position to start the motor The pump should start and settle into a slow idle 3 Insert the dispensing nozzle into the container to be filled 4 Operate the nozzle to dispense fluid release nozzle when the desired amount of fluid has been dispensed 5 Move switch lever to the OFF lowered position to stop the motor 6 Remove the di...

Страница 8: ...218 54 8 604 21 73 R 856 269 29 10 602 312 23 12 293 76 37 3 007 235 56 9 274 97 27 3 830 23 22 914 3 18 125 69 61 2 741 50 70 1 996 46 58 1 834 259 46 10 215 218 43 8 599 106 74 4 202 160 44 6 317 193 10 7 603 5 197 80 3 150 50 74 1 998 14 551 97 30 3 831 250 90 9 878 NX25 120 NX25 240 Dimensional Information Bung Mount Dimensional Information Foot Mount Dimensional Information ...

Страница 9: ...ermal protection Electronically Protected Certification UL cUL Motor Pump Specification Design Rotary Vane GPM in Supplied Configuration 25 GPM 95 LPM Bypass Pressure Rating PSI Max 25 PSI Dry vac in Hg 11 Head Max 48 5 Inlet size thread 1 1 4 Bung Mount 1 Foot Mount NPT and BSP available Outlet size thread 1 NPT BSP available Inlet Material Cast Iron Mount 2 NPT Bung 2 BSP Bung Foot Mount Materia...

Страница 10: ...while servicing Servicing the Bypass Valve Re assembly The bypass valve is located inside the pump housing It is accessed through the inlet and outlet openings It consists of three main components Figure 1 A Bypass Valve Retainer B Bypass Valve Spring C Bypass Valve 1 Unbolt the pump from the tank adapter 2 Using a blunt object approximately 4 long i e a deep well socket on an extension inserted i...

Страница 11: ... NPT Bung NPT AD 1 X 20 1 Automatic Arctic Duty UL cUL Motor NX25 120NB AE 120V 2 NPT Bung NPT AE 1 X 20 1 Automatic Arctic Duty 900CD UL cUL Motor NX25 120NF PX 120V Foot Mount NPT PX UL cUL NX25 120NF AA 120V Foot Mount NPT AA 1 X 18 1 Ultra Hi Flow Automatic UL cUL NX25 240NF PX 240V Foot Mount NPT PX UL cUL NX25 240BF PX 240V Foot Mount BSP PX NX25 240BB PX 240V 2 BSP Bung BSP PX Accessory Pac...

Страница 12: ...zle boot kit KIT321SK External seal kit KIT321JC Junction box cover kit KIT321SW Switch kit KIT321ASN Anti siphon kit Servicing Rotor Vanes and Shaft Seals The rotor vanes and shaft seals are inside the pump housing and are accessed through the rotor cover located on the face of the pump It is held in place with three 4mm hex drive attaching bolts You can access the rotor and vanes for inspection ...

Страница 13: ...tuthill com INSTALLATION AND OPERATION MANUAL NX25 120 NX25 240 Exploded View Bung Mount Configuration Foot Mount Configuration KIT321JC KIT321NB KIT321BG KIT321SW KIT320SL KIT321RG KIT321JC KIT321SW KIT320SL KIT321RG ...

Страница 14: ...r horizontal inlet plumbing Reduce vertical or horizontal distance from pump to liquid 6 Bypass valve stuck Open valve remove debris Low capacity 1 Excessive dirt in screen Remove and clean screen 2 Suction line problem Check suction line for leaks or restrictions it may be too small in diameter too long not air tight or too low vertically 3 Excessive rotor vane rotor cover or housing wear Inspect...

Страница 15: ...ut voltage auto shut off Check incoming voltage Locked rotor auto shut off Turn switch off and inspect rotor and vanes Priming Suction Lift failure Check for leaks in suction tube inlet connections inside tank plumbing restrictions excessive vertical suction lift empty tank 4 Tone Faults Hardware faults Tones Condition Solution Hardware fault auto shut off Troubleshoot as described below Hardware ...

Отзывы: