![TURNTIDE VES-Artex AFRV72 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/turntide/ves-artex-afrv72/ves-artex-afrv72_installation-manual_1182257018.webp)
4-2
Copyright © 2022 ves-artex.com |
All Rights Reserved
Operation and Maintenance
Component
Timeline
Task
Exhaust Cone and
Fan Housing
6 Months
Clear cone and housing of any debris.
General cleaning: clean surface so air can flow over smoothly.
Check hardware for loose connections.
Inspect for damage. Repair or replace.
Square Guard
6 Months
Clear guard of any debris.
Clean surface from both sides.
Check hardware for loose connections.
Inspect for damage. Repair or replace.
Shutter
3 Months
Clear shutter of any debris.
General cleaning: clean surface of louvers so air can flow over
them smoothly and they rotate freely.
Check hardware for loose connections.
Ensure that rods are properly engaged.
Inspect for damage. Repair or replace.
EDK
(Exterior Deflector Kit)
6 Months
Clear EDK of any debris.
Clean surface so air can flow over them smoothly.
Check hardware for loose connections.
Inspect for damage. Repair or replace.
Control
6 Months
Remove dust from heat sink. For motor label location
(
I
)
see
“Motor Control” on page 3
.
To avoid shock injury or catastrophic electrical damage
to VES-Artex products, do not use pressurized water on
motor or control. Introducing pressurized water will void
the warranty.
Maintenance Schedule - Attachments
COMING SOON