Turnils FA 22 Скачать руководство пользователя страница 1

INSTALLATION MANUAL

FA SERIES

FOLDING ARM AWNINGS

INSTALLATION - OPERATION - CLEANING

Terrace awning

Nordic Light 

FA20

Содержание FA 22

Страница 1: ...INSTALLATION MANUAL FA SERIES FOLDING ARM AWNINGS INSTALLATION OPERATION CLEANING...

Страница 2: ......

Страница 3: ...c FA 42 SIROCCO Design FA 44 SIROCCO Cross Over FA 45 SIROCCO Fabric Beam FA 46 SIROCCO Semi Cassette FA 48 VIENTO Semi Cassette FA 58 Hunter Douglas Limited does not warrant the accuracy contained in...

Страница 4: ...eries Vikarmsmarkis Folding arm awning 21 1 2016 Article No Description Note Stand pack Drive bushing 85 mm Polyamide for roller tube 74 8560 70 Drivbussning Polyamid f r valsr r 74 8560 70 Includes b...

Страница 5: ...ost versions be provided with a hood profile of extruded aluminium and with aluminium hood side covers and hood bracket in extruded aluminium Joining piece in stainless steel PROFILES The front tube a...

Страница 6: ...close to the arm s attachment on the supporting tube as possible Mark out and drill the holes for these brackets NOTE the wave line Mount the brackets using the requisite plugs and screws Stretch a p...

Страница 7: ...awning Nordic Light FA20 Installation Operation Cleaning 3 Installing the roof Mount the roof brackets to the roof using a bracket at each outer end of the roof The remaining brackets are mounted at...

Страница 8: ...stributed evenly ver the awning roof crew on the nuts loosely so that he roof can be adjusted when it is n place Mount the roof to the square tube nd tighten the screws hen move the roof bracket ownwa...

Страница 9: ...R TUBE The fabric should be positioned 25 mm from the edge of bushing on the roller side to come straight into the cassette FA 22 FA 42 FA 44 FA 45 FA 46 HOOD The hood brackets should be assembled 600...

Страница 10: ...where it will be exposed to maximum wind effect NOTE It is possible to connect one 1 single wind sensor to several controllers please contact us But you cannot connect several wind sensors to one 1 si...

Страница 11: ...1 2015 4 Nordic Light FA20 Installation Operation Cleaning 2 Adjustment of projection angle The awning s projection angle is adjusted with the stop screw and the screw located in the arm holder Crank...

Страница 12: ...w 2 is not stressed NOTE There may be a bang when the arm is lifted and the conical washer loosens Adjust the stop screw 2 so that the arm has the desired height position The recommended minimum incli...

Страница 13: ...replaced in order for the awning to maintain its finish and function WARNING ALWAYS ALLOW A PROFESSIONAL TO ADJUST THE FOLDING ARMS An awning has very powerful springs inside the arm s aluminium profi...

Страница 14: ...INSTALLATION OPERATION CLEANING FA SERIES FOLDING ARM AWNING 14 NOTES...

Страница 15: ...INSTALLATION OPERATION CLEANING FA SERIES FOLDING ARM AWNING 15...

Страница 16: ......

Отзывы: