
Chapter 1 Node Start-up and Commissioning
Commission the Node
Release TR3.2.1
Turin Networks
Page 11-9
13
Is this node is connected or routed to the management server?
•
No
. Go to Step 14.
•
Yes
. Enter the EMS IP information:
Type:
set node ip ems-ip
aaa.bbb.ccc.ddd
ems-mask
aaa.bbb.ccc.ddd
ems-gw
aaa.bbb.ccc.ddd
where:
aaa.bbb.ccc.ddd
is the correct IP address from your network
administrator.
14
Restart the node:
Type:
exec node restart
CLI responds:
Are you sure you want to execute this
command? [yes|no]
:
Type:
yes
The node begins the restart sequence.
15
Exit your terminal emulation session.
16
The Commission the Node procedure is complete.
Continue to
Insert the Standby GCM and All Cards in the Traverse Node
Table 11-6 Commission the Node (continued)
Step
Procedure
Содержание TransNav
Страница 5: ...Release TR3 2 1 Turin Networks Page iii Installation and Commissioning Checklists 12 21 Index Index 1 ...
Страница 6: ...Page iv Turin Networks Release TR3 2 1 ...
Страница 14: ...Traverse Installation and Commissioning Guide Calling for Repairs Page xii Turin Networks Release TR3 2 1 ...
Страница 101: ...Chapter 1 Power Interface Specifications PDAP 4S Release TR3 2 1 Turin Networks Page 4 3 ...
Страница 316: ...Traverse Installation and Commissioning Guide Section 12 Appendices Page ii Turin Networks Release TR3 2 1 ...
Страница 361: ......
Страница 362: ...Visit our website at www turinnetworks com Release TR3 2 1 Traverse System Documentation 800 0002 TR321 ...