© Trynex International 2008 L1305
1
— 30
MS-1875 Bulk Material Spreader
R
Mounting Instructions For TPM-275
Step 1:
Install clevis weldment in center of upper rail as shown. Drill two 3/8 inch clearance holes in upper rail and fasten
using 3/8-16 x 2 inch hex bolts with locking nuts provided.
Step 2:
Install four channel weldments in ends of upper and lower rails as shown. Fasten in four places using 3/8-16 x 2”
hex
bolts along with locking nuts provided. Drill and bolt four holes (do not tighten yet).
Step 3:
Install two upright /legs into channel weldments as shown. Fasten with 3/8-16 x 3-1/4 inch hex bolts along with
washers an locking nuts provided.
Step 4:
Tighten all hardware.
Step
5:
Install and tighten lift arm pins as shown in illustration.
Step 6:
Install unit on any cat
e
gory one tractor mount.
NOTE: Pay special attention when drilling or clamping dissimilar metals to aluminum bodies. Galvanic corrosion can
occur if not handled properly. Contact vehicle manufacturer for recommended practices.
Rev. 01
Содержание MS-1875
Страница 9: ... Trynex International 2008 L1305 1 9 Bulk Material Spreader Model MS 1875 R Rev 01 ...
Страница 11: ... Trynex International 2008 L1305 1 11 Bulk Material Spreader MS 2000 Side and Bottom View R Rev 01 ...
Страница 12: ... Trynex International 2008 L1305 R 1 12 Bulk Material Spreader Model MS 2000 Rev 01 ...
Страница 15: ... Trynex International 2008 L1305 1 15 MS 2000 Spinner Drive Assembly Parts Breakdown Rev 01 ...
Страница 19: ... Trynex International 2008 L1305 1 19 R MS 1875 Gate Exploded View Rev 01 ...
Страница 35: ... Trynex International 2008 L1305 1 35 MS 1875 MS 2000 Blank Page R THIS PAGE INTENTIONALY LEFT BLANK Rev 01 ...
Страница 36: ... Trynex International 2008 L1305 1 36 MS 1875 MS 2000 Blank Page R THIS PAGE INTENTIONALY LEFT BLANK Rev 01 ...
Страница 41: ... Trynex International 2008 L1305 1 41 MS 1875 MS 2000 Blank Page R THIS PAGE INTENTIONALY LEFT BLANK Rev 01 ...