![TurboChef NGC-3069 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/turbochef/ngc-3069/ngc-3069_field-service-bulletin_1181114002.webp)
FSB10062A
3/29/07
Page 2 of 2
Step 5—Attach the new power supply to the bracket.
a.
Using the three M3 screws and split-lock washers provided, attach the power supply to the bracket as shown
in Figure 1.
Step 6—Install the new power supply.
a.
Using the two truss-head screws provided, install the power supply to the top of the electrical compartment
frame as shown in Figure 1.
Step 7—Reinstall the top panel.
Step 8—Reinstall the right side panel.
Step 9—Plug in the oven and verify that the control board display turns on.
Figure 1: Power Supply Installation
Provided
truss-head screws
Provided M3
screws and washers
Bracket
Power Supply
- End of Procedure -