
4
Installation
IMPORTANT:Installation must be carried out by our registered contractors.
1.
Installation Height
Minimum height from the hob surface to the underside of range hood:
- 600 mm for electric hob
- 650 mm for gas hob
*If the instruction for the gas hob installation specified a greater distance, this
has to be taken into account
NOTE: Any installation above 700mm will compromise the performance of this
range hood.
If the ceiling is low and hood is installed without extended chimney, there
should be at least 3cm gap between the ceiling and chimney.
Installation Steps
1. Determine height between cooker hob and base of hood.
2. Mark wall to suit all bracket locations. Drill holes of 50mm depth at the
selected drilling position.
3. Insert the flow exit to the hood and follow by connecting the flexible
exhaust duct to the flow exit.
4. Lift and hang the hood to the wall bracket and please ensure it sits firmly
on the bracket.
5. Fit in the safety baffle of the hood onto the wall to strengthen the
position and to reduce vibration when the hood is switched on.
6. Chimney extension can be installed to the ceiling or wall.
7. Ensure the oil collection container is in place before the hood is being
used. To remove it for cleaning, slide the oil collection container from front
to rear, vice versa for inserting it into position.