
12 Putting the device into operation
106
connected to the nurse call system according to the Flamenco
IP+
Tech-
nical Manual.
3. If the device is not powered by PoE or PoE+ (PoE switch), connect the
12 V DC power adaptor to the power jack [1] ] (figure 63) and to a 230 V
socket.
✔
The device is starting up. The ComStation
IP
app login screen appears
automatically. The ComStation
IP
is ready for operation.
CAUTION!
Only use the 12 V DC power adaptor included in the
scope of delivery. Use of another power adapter may damage
the unit.
CAUTION!
DO NOT switch off the device during system start-up
or when updating the firmware. Doing so may damage the
firmware.
Содержание ComStation IP
Страница 1: ...00 8813 85 tunstall de ComStationIP Order no 76 0605 50 User Guide ...
Страница 6: ...6 ...
Страница 16: ...1 Safety instructions 16 ...
Страница 19: ...2 Basic knowledge 19 2 2 Sample ward Fig 8 Sample ward ComStationIP ...
Страница 32: ...3 Device description 32 ...
Страница 60: ...6 Handling calls 60 ...
Страница 78: ...8 Calling 78 ...
Страница 84: ...9 Ward coupling 84 ...
Страница 92: ...10 Shift operation 92 ...
Страница 107: ...12 Putting the device into operation 107 Fig 64 Log in screen LOG IN Monday 13 June 2020 ...
Страница 112: ...12 Putting the device into operation 112 ...
Страница 114: ...13 Cleaning and disinfection 114 ...
Страница 117: ......
Страница 118: ...Tunstall GmbH Orkotten 66 48291 Telgte Germany e info tunstall de w tunstall de ...