![Tucson TADD-1 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/tucson/tadd-1/tadd-1_assembly-and-operation-manual_1179329013.webp)
Capacitor Installation
Ok
Procedure
Install a 0.001 uF (102) capacitor at C5, C6, C7, C8, C18, C19, C33, C34
Solder and clip 16 leads.
Install a 0.01 uF (103) capacitor at C11, C13, C14, C25, C26, C37, C38
Solder and clip 14 leads.
Install a 0.1 uF (102) capacitor at C1, C2, C3, C4, C9, C10, C12, C15, C16, C17, C20,
C21, C22, C29, C30, C35, C36, C41
Solder and clip 36 leads.
Install a 0.33 uF (334) at C40. This is a polarized capacitor. The positive lead should
be toward the voltage regulator IC, and the negative lead toward the front of the board.
Solder and clip 2 leads.
Install a 1 uF (101) at C42, C43, C44
Solder and clip 6 leads.
Electolytic capacitors are polarized. The positive lead goes in the hole on the board marked with a "+".
NOTE: The orientation of the positive (+) leads are not all the same.
Be careful! The negative or the
positive lead may be marked.
Ok
Procedure
Install a 10 uF electrolytic capacitor at C39. the positive lead should be toward the
front of the board.
Double-check polarity and then solder/clip 2 leads.
Next
Trimmer Installation
Ok
Procedure
Install a 2.5k trimmer at R13.
Solder and clip 3 leads.
Next