5-5
Section 5 - Operation -
Nitro
Optional Night Light Kit Operation
Spreaders equipped with a Mechanical Light Kit do not require any user input to operate. Light covers raise
and lower in conjunction with the endgate.
Optional Two Stage Beater Operation
Spreaders equipped with two stage beater options are used to process poultry litter and materials of like
consistency. Two stage beater use horizontal beaters to push material down to spinners, which in turn
discharge material to field. Operation sequence is the same as standard vertical beaters.
NOTE:
Lower gate can be pushed towards endgate if material is dropping directly onto spinners.
NOTE:
Spinner paddles can be adjusted to change the spread width. See
.
CAUTION:
Lower endgate as load level clears horizontal beaters. This will ensure material is not thrown back
towards tractor cab.
Optional Scale System
The optional scale system comes in several variations.
The entry level system allows for static weight measuring only.
The intermediate system allows for weight measuring, GPS speed tracking, manual spread width, automatic
apron chain speed control, and data collection via memory card.
The advanced system allows for weight measuring, GPS speed tracking, manual spread width, automatic
apron chain speed control, data collection via memory card, and apron chain pausing via monitor button for
end of row control.
Stop apron chain, lower endgate and shutdown PTO after finishing spreading application.
See provided scale system manufacturing literature for more advanced features and detailed instructions.
Spreaders equipped with manual light kits require
users to manually lower and raise light covers.
Speaders with hydraulic light kits require a tractor
hookup to operate.
Содержание NITRO 275RS
Страница 35: ...7 4 Section 7 Service Maintenance Nitro Grease Points ...
Страница 36: ...Nitro Section 7 Service Maintenance 7 5 ...
Страница 37: ...7 6 Section 7 Service Maintenance Nitro Optional Grease Line Ports ...
Страница 38: ...Nitro Section 7 Service Maintenance 7 7 ...
Страница 39: ...7 8 Section 7 Service Maintenance Nitro Optional Two Stage Beater Lubrication Points ...
Страница 40: ...Nitro Section 7 Service Maintenance 7 9 Optional Two Stage Beater Lubrication Points 750 950 ...
Страница 45: ...V Torque Values Imperial Nitro Torque Values Imperial ...
Страница 46: ...Nitro Torque Values Metric VI Torque Values Metric ...
Страница 49: ......