Beijing TT Aviation Technology Co., Ltd.
Add: No.1 TTA Building, Niantou Industrial Park ,Changping District,Beijing, China
www.ttaviation.org
23
①
Master switch
⑥
Current switch
⑪
Storage button
②
Air intake
⑦
Micro-USB update port
⑫
Handle
③
Brand
⑧
LCD monitor
⑬
Cooling fan
④
Charge port
⑨
LED
⑭
AC input port
⑤
Master Voltage
⑩
Charging button
1) Connect the charging station and charging manager by inserting the XT port and
balance port. Fix their connection with 4 screws.
Fixed
Connection
2) Insert the port of power cable into the input port of charging station first. Then connect
a AC power, 100~240V, 50/60HZ.
3) Connection of M6E-X 12S intelligent battery
AC Input Connection