(1) The equipment employs natural convection cooling, and it can be installed indoor or outdoor.   

(2)  Please install the equipment under the guidance of Figure4.1. Vertical installation on floor level is 

recommended. Mount vertically or tilted backwards by max. 15°. Never install the  inverter tilted forwards, 

sideways, horizontally or upside down. 

(3) Install the inverter at eye level for convenience when checking the LCD display and possible maintenance 

activities. 

(4) When mounting the inverter, please consider that disassembly for service work may be required. 

4.3.2 Installation Position 

Do not expose the inverter to direct solar irradiation as this could cause power derating due to overheating. The 

ambient temperature should be between -25°C 

  +60°C

-13° F 

  140° F

to ensure optimum operation. 

Choose locations with sufficient air exchange. Ensure additional ventilation, if necessary. 

To make sure the installation spot is suitably ventilated, if multiple TSUN hybrid solar inverters are 

installed at same area, the following safety clearance in Figure 4.2 shall be followed. 

50CM

30CM

50CM

30CM

30CM

 

Figure 4.2 Minimum Clearance 

4.4 Mounting Procedure 

4.4.1 Mark the Positions of the Drill Holes of the Rear Panel 

The mounting position should be marked as shown in Figure 4.3. 

Содержание TSOL-H3.0K-S

Страница 1: ...1 TSOL H3 0K S TSOL H3 6K S TSOL H4 0K S TSOL H4 6K SE TSOL H5 0K SE TSOL H6 0K SE TSOL H4 6K S TSOL H5 0K S TSOL H6 0K S...

Страница 2: ...2 Pre installation Check 11 4 3 The Determination of the Installation Method and Position 11 4 4 Mounting Procedure 12 5 Electrical Connection 15 5 1 Safety Instruction for Hot line Job 15 5 3 AC gri...

Страница 3: ...indicates a hazardous situation which if not avoided will result in death or serious injury WARNING WARNING indicates a hazardous situation which if not avoided can result in death or serious injury o...

Страница 4: ...e installation service recycling and disposal of the inverters must be performed by qualified personnel only in compliance with national and local standards and regulations Any unauthorized actions in...

Страница 5: ...uring operating An error has occurred Please go to Chapter 9 Troubleshooting to remedy the error This device SHALL NOT be disposed of in residential waste Please go to Chapter 8 Recycling and Disposal...

Страница 6: ...end the AC into the grid reduce the load pressure of the grid When the grid failure provide AC source to supply important loads achieve uninterrupted power supply function 3 2 Specification for Produc...

Страница 7: ...ent A 60 60 Battery Capacity AH 50 2000 Charging Mode Control 2 stages Grid Data On grid Mode Rated Output Power W 3000 3680 4000 4600 5000 1 6000 Max Output Power W 3000 3680 4000 4600 5000 6000 Rate...

Страница 8: ...e Terminal Block AC Connection Type Terminal Block Display LCD Communication port RS485 2 RS232 DRM 2 Integrated Communication Mode Wi Fi GPRS Ethernet Optional General Data Topology Transformerless I...

Страница 9: ...tery Capacity AH 50 2000 Charging Mode Control 2 stages Output AC Rated AC Power VA 4600 5000 6000 Max AC Apparent Power VA 4600 5000 6000 Rated AC Current A 20 21 8 26 1 Max AC Current A 20 9 22 7 27...

Страница 10: ...rface DC Connection MC4 Battery Connection Terminal Block AC Connection Terminal Block LCD Display LCD Display Communication WiFi GPRS General Data Operating Temperature Range 25 C to 60 C 45 C derati...

Страница 11: ...ion directly exposed under intensive sunlight is not recommended The installation site must be well ventilated 4 2 Pre installation Check 4 2 1 Check the Package Although TSUN s inverters have surpass...

Страница 12: ...e work may be required 4 3 2 Installation Position Do not expose the inverter to direct solar irradiation as this could cause power derating due to overheating The ambient temperature should be betwee...

Страница 13: ...drill 4 holes in the wall in conformity with position marked in Figure 4 4 and then place expansion tubes in the holes using a rubber mallet 380 160 8 Figure 4 4 Drill holes dimensions of TSOL H inve...

Страница 14: ...el of TSOL H inverter 4 4 4 Mount the Inverter Carefully mount the inverter to the rear panel as shown in Figure 4 6 Make sure that the rear part of the equipment is closely mounted to the rear panel...

Страница 15: ...onformity with national rules and regulations The direct connection between the inverter and high voltage power systems must be operated by qualified technicians in accordance with local and national...

Страница 16: ...regulation compliance it s requested to install a breaker 63A between grid and inverter Cable Cross sectional area mm External diameter mm Range Recommend Range Recommend 2 5 6 0 4 0 8 14 14 Table 5...

Страница 17: ...Cables 5 3 3 Secure all parts of the grid and backup connector tightly Figure 5 4 Screw the Connector 5 3 4 During off network operation time null line at the BACK UP end will remain to be connected...

Страница 18: ...Screw 3 Negative Connector Figure 5 6 Negative Connector NOTICE Please place the connector separately after unpacking in order to avoid confusion for connection of cables Please connect the positive...

Страница 19: ...ssed cable is larger than 400N 5 Plug in the pressed positive and negative cables into relevant insulated enclosure a click should be heard or felt when the contact cable assembly is seated correctly...

Страница 20: ...on Caution For safety operation and regulation compliance it s requested to install a breaker 125A between battery and inverter Cable Cross sectional area mm External diameter mm Range Recommend Range...

Страница 21: ...Connection Left 1 EXT SYNC RS485 CAN 2 GND 3 NONE 4 CANH 5 CANL 6 GND 7 RS485 A 8 RS485 B Right DRM NC 1 DRM 1 5 2 DRM 2 6 3 DRM 3 7 4 DRM 4 8 5 RefGen 6 Com DRM 0 7 V 8 V Table 5 6 RJ45 pin port defi...

Страница 22: ...rs have purchased the smart meter that recommended by TSUN before setting the zero injection function users shall connect the meter to the system with procedures below 1 Power cable connection Feed th...

Страница 23: ...nfirm communication address of meter and hybrid inverter For both meter and hybrid inverter the default communication address is 1 If the communication addresses are different users can set the commun...

Страница 24: ...splay interface and there is no further operation is required to start the meter 6 After settings users can move to set the Zero Injection on the hybrid inverter Figure 5 16 Zero injection setting Not...

Страница 25: ...25 5 17 Inverter ground protection...

Страница 26: ...d Red Working abnormally C COM status Flash Yellow and Blue Communicating or updating Table 6 1 Instructions of the Interface Button Operation Description D ESC Return to the previous menu or cancel t...

Страница 27: ...y After the time setting set the battery parameter in the inverter Select adjust the parameters as per your battery specification Press or to change the battery and parameters and press ENT Figure 6 3...

Страница 28: ...tion includes date time operating status and monitoring status The operating status is shown as below Data name Explanation Init Mode The inverter is in initialization StandBy Mode The inverter is in...

Страница 29: ...he power of the load The status of load is shown as below Status Explanation No power grid connected Power grid connected but no energy output Power grid connected and energy output Table 6 6 Grid sta...

Страница 30: ...aily generation Figure 6 7 Power Trading of Grid and daily generation Figure 6 8 Load power and daily generation The figure above shows the PV loads or trading of Grid in all day long E Today represen...

Страница 31: ...s the daily PV input in this month Figure 6 10 Daily sell to Grid in this month In the figure above it shows the daily output in this month Figure 6 11 Daily load consumption in this month In the figu...

Страница 32: ...it shows the annual power of PV Grid trading power and load output in recent 6 years It also shows the final accumulated power of PV Grid and load power in this year on the right of figure 6 4 Menu Li...

Страница 33: ...in the future Figure 6 15 Language Setting 6 4 1 3 Display Setting Brightness and backlight time can be set here Press or to change the values and press ENT Figure 6 16 Display Setting 6 4 1 4 Commun...

Страница 34: ...Press or to change the values and press ENT Figure 6 18 Enter Current Password Figure 6 19 Enter New Password 6 4 1 6 Auto test Fast Auto test Fast can be started here Press or to choose Test all the...

Страница 35: ...mode Time of use mode Timing mode Peaking shaving mode and Passive mode Press or to choose the working mode and press ENT Figure 6 22 Parameter setting of working mode Auto Mode When the solar is suff...

Страница 36: ...ng of set timing mod Peak shaving Mode When inverter output power exceeds the value of Injection the zero injection function would start automatically to prevent PV system from exporting electricity t...

Страница 37: ...e 1 Pylon RS485 2 NONE Pb Figure 6 26 Battery type setting Depth of Discharge Standard XX EPS Mode XX Safety Buffer XX OK Figure 6 27 Depth of discharge setting Current Limit Charge XX A Discharge XX...

Страница 38: ...can be cleared here Press or to choose Yes and press ENT Figure 6 30 Clear Events 6 4 2 5 Country Setting Safety standard can be reset here Press or to choose the country and standard and press ENT Mo...

Страница 39: ...can Now to scan the MPPT right now 6 4 2 7 Derating Setting Derating function can be set here Press or to choose the Enable then press ENT and change the value Figure 6 33 Derating Setting 6 4 2 8 Rea...

Страница 40: ...or off here Press or to choose Yes or No then press ENT 6 4 2 11 Q v Setting Q v function can be turned on or off here Press or to choose Yes or No then press ENT 6 4 2 12 Control 81 S1 81 S1 functio...

Страница 41: ...5 EPS Setting EPS output can be turned on or off here Press or to choose Yes or No then press ENT 6 4 2 16 Factory Reset Inverter can be reset to the original status and clear all the data here Press...

Страница 42: ...Hz OF2 xxx Hz UF1 xxx Hz UF2 xxx Hz MPPT Scan Enable xx min Zero Injection Enable xxx W Working Mode Auto Mode The battery information is shown as below Battery Type xxx Battery Capacity xx A Depth of...

Страница 43: ...Last Week Energy and Today Energy Figure 6 40 Statistics 6 4 6 Status Status can be checked here include PV Status Grid Status EPS Status and Battery Status Figure 6 41 PV Status Figure 6 42 Grid Sta...

Страница 44: ...The equipment can be connected to local internet via a Wi Fi module and the Wi Fi web server which is embedded in the machine following this the operational status of the inverter can be monitored By...

Страница 45: ...rdware Over current Error 15 HWPV2 Curr High Err PV2 Hardware Over current Error 16 HWInv Curr High Err Inverter Hardware Over current Error 17 Inv Short Err Inverter short circuit error Error 18 Over...

Страница 46: ...Error 47 CHG1 Curr Err Charging bridge 1 current error Error 48 CHG2 Curr Err Charging bridge 2 current error Error 49 Grid Volt Consis Warn Data Consistency of Grid Voltage Error Alarm 50 Grid Freq...

Страница 47: ...or phone TSUN No Grid Error Check the connection status between the AC side of the inverter and the grid if the above mentioned are in normal please contact your distributor or phone TSUN GFCI Error...

Страница 48: ...and date of purchase are required for the service Besides the trademark on the product should be clearly visible otherwise warranty is not available The product warranty covers all damage caused by d...

Страница 49: ...49...

Отзывы: