background image

 

 

5.4 Install the right cover 

Use the M4 screw originally removed to lock the cover plate. Torque is recommended 

14kgf.cm. 

 

6 Debugging Instructions 

6.1 System commissioning

 

After the wiring is completed, please refer to the ACU series manual for system 

operation. 

Note: Turn on the battery switch and BMS switch when using the battery. 

 

 

Содержание TSOL-B100E-S

Страница 1: ...31 TSOL B100E S...

Страница 2: ...ion 4 3 2 Product Model Description 4 3 3 Datasheet 5 4 Installation Instructions 5 4 1 Items in the package 5 4 2 Installation Position 6 4 3 Mounting Procedure 7 5 Electrical Connections 11 5 1 Elec...

Страница 3: ...The tasks described in this manual only can be performed by qualified personnel 1 3 Symbols Used The following types of safety instructions and general information appear in this document as describe...

Страница 4: ...ds on battery can install maintain retrieve and process this product TSUNESS shall not be liable for any loss or warranty claims arising from any unauthorized change of product which may cause fatal i...

Страница 5: ...urred Read the usage manual to troubleshoot problems This device SHALL NOT be disposed of in residential waste Please go to Chapter Seven Battery maintenance for proper treatment Recyclable 2 3 Emerge...

Страница 6: ...arge or over discharge The battery employs modular design for easy installation and wiring and can be used by up to 3 parallel devices Battery is also called slave machine in the following text 3 2 Pr...

Страница 7: ...al Parameters Battery Type Lithium ion Communication CAN Operating Temperature Range 0 C 45 C Cooling Method Natural Convection Ambient Humidity 0 95 Non condensing Ingress Protection IP65 Dimensions...

Страница 8: ...tion and suggests an indoor installation or an installation under a sheltered place to prevent the battery from exposure to direct sun rain and snow erosion Vertical ground mounting method is recommen...

Страница 9: ...r air circulation will affect the performance of internal electronic components and shorten the service life of inverter 4 3 Mounting Procedure The battery uses free standing installation and its posi...

Страница 10: ...on of bracket s holes on the wall and drill the holes Then use a rubber hammer to drive screws into the holes TSOL ACU3 0K is a master machine while TSOL B100E S is a slave machine To ensure the insta...

Страница 11: ...Fix the brackets in the marked position with hex screws...

Страница 12: ...machine and the salve machines Carefully mount the device onto the brackets and make sure the bottom of the device is attached to the brackets One master machine can be matched with up to three more...

Страница 13: ...ect Description A BMS switch B Battery switch C c BAT port D d BMS LINK port E e BAT port 5 2 Slave connection Make sure that the circuit breaker is off remove the right wiring cover screw and pull ou...

Страница 14: ...hen there is a hole plug as shown in the figure below Then pass the original cable through the waterproof jacket Only 3 cables are required BAT BAT BAT BAT LINK LINK to connect a slave Be careful when...

Страница 15: ...cket and then crimp the RJ45 plug Object Description 1 blank 2 blank 3 blank 4 blank 5 blank 6 blank 7 RS485A 8 RS485B Note Please use the original matching battery cable Do not connect one battery to...

Страница 16: ...to lock the cover plate Torque is recommended 14kgf cm 6 Debugging Instructions 6 1 System commissioning After the wiring is completed please refer to the ACU series manual for system operation Note T...

Страница 17: ...in an environment with a temperature of 18 C to 28 C and a humidity of 85 RH 4 The battery should be stored in accordance with the storage requirements mentioned above and the battery should be instal...

Страница 18: ......

Отзывы: