background image

Talent-MG2-WU/GU

7

1.  Visit the monitor website 

pro.solarmanpv.com

 directly. Or enter this monitor website 

by the official website of TSUNESS 

www.tsun-ess.com .

Step 2: Establish an account

2.  Click the “Register” button and register a new account.   

Website Configuration

1.  Install the microinverter system. Please read the Quick Installation Guide or the User 
Manual of microinverter on 

www.tsun-ess.com/downloads

 before installation.

2.  Install the monitoring device. Connect the power adapter into the socket
3.  Make sure the microinverter system and the monitoring device are working well. 

Step 1: Install the microinverter and the monitoring device

www.tsun-ess.com

Содержание Talent-MG2-GU

Страница 1: ...Talent MG2 WU Talent MG2 GU User Manual TSUNESS Co Ltd STORE THE FUTURE...

Страница 2: ...Technical Data 3 Installation 4 Wi Fi Configuration Only Talent MG2 WU 5 LED Description 6 Website Configuration 7 Step 1 Install the microinverter and the monitoring device 7 Step 2 Establish an acc...

Страница 3: ...cal problems about our products contact the TSUN Service line Read Me First Only qualified personnel should install troubleshoot or replace the monitoring system Before installation check the unit to...

Страница 4: ...At the same time Monitor Device connects to the Internet through WIFI Talent MG2 WU or GPRS Talent MG2 GU which realizes the information exchange with the monitoring service and sends all the running...

Страница 5: ...maximum 20 55 143 33 12 5 0 1 Plug in LED Adapter with USB port Signal Maximum Distance Open Space Monitoring Data Limit Communication to Server Sample Rate Signal Power Supply Adapter Type Input Vol...

Страница 6: ...meter above the ground The table should not be metal or concrete structure to prevent the effects on 2 4G RF signal The distance between the monitoring device and the router should be as close as poss...

Страница 7: ...Wi Fi configuration page The username and password are admin by default 3 Click the Wi Fi parameter menu on the left menu bar to enter the Wi Fi parameter configuration 4 Click the search button in th...

Страница 8: ...ht Shining Power on 1 2 3 4 5 6 7 8 Upgrade procedure normal operation ID search is not complete Not ID Not connected to WIFI Server not connected Receive server data Alternate Shining 1 3s Alternate...

Страница 9: ...new account Website Configuration 1 Install the microinverter system Please read the Quick Installation Guide or the User Manual of microinverter on www tsun ess com downloads before installation 2 I...

Страница 10: ...le click Select a File to upload file 2 Click Select to input the SN of monitoring device Step 3 Networking for the monitoring system 1 Login to the platform and find the Network page by Applications...

Страница 11: ...tep 4 Create a Plant 1 Find the Plants page by Monitor Plants Click Create a Plant to create a new plant 2 Input basic information system information yield information and owner information in this pa...

Страница 12: ...G2 WU GU 4 All the plants can be viewed and managed in Plants page 3 Click Save and add a monitoring device in this plant Click add a New Gateway Logger and input the SN of the monitoring device www t...

Страница 13: ...e components to the right side to finish the physical layout Step 5 Edit the system layout 1 Find the Plants page by Monitor Plants plant name Then enter the Layout page and click Click here to edit s...

Страница 14: ...TSUNESS All rights reserved All specifications are subject to change without prior notice www tsun ess com sales tsun ess com Building D2 No 555 Chuangye Road Jiaxing Zhejiang Province China TSUNESS C...

Отзывы: