Make sure the CT (Current Transformer) has been installed in the right direction,
otherwise will affect the current readings and Meter function. Meter install on the Grid
side, the CT arrow pointed to the Grid.
The picture below indicates the RS485 A Port and B Port on the monitor device.
When the RS485 cable length is more than 200m, use the shorting jumper on the first two
ports from the RS485 port.
For CHINT Single Phase Meter:
For CHINT Three Phase Meter:
Step 5: Connect the meter to the RS485 port of monitor device
20
www.tsun-ess.com
Talent-MG2-WP/GP