background image

buyTSI.com     -     800.223.4540

Visit www.buyTSI.com for any additional information. Also be sure to follow us on all the Socials, and 

subscribe to our YouTube channel for all our product videos.

Warranty & Workmanship you can depend on.
With over 30 years of manufacturing experience we maintain the ability to provide competitive 

prices while employing and manufacturing the majority of our products in the USA. Pride in 

our workmanship and standing behind each and every product is not just our claim but our 

uncompromising responsibility. 

Tire Service International equipment is warranted to be free from defects in materials and 

workmanship for a period of one year from the date of original purchase to the original owner. 

Repair labor is warranted for 90 days from the date of original purchase. Bushings, blades, bearings 

and normal wear and tear are not covered under warranty. Careless handling, negligence, misuse, 

abuse, mutilation, improper operation, making unauthorized repairs, additions, and or alterations 

automatically cancel this warranty and relieves TSI of any obligation. Cheetah tanks claimed to be 

defective while under warranty will be evaluated at our manufacturing plant and either repaired 

if possible or exchanged and returned or credit issued to the customer account at our discretion. 

Damage resulting from dropping the tanks will not receive warranty consideration. Warranty parts 

need to be returned prepaid to the plant for credit. Any replacement parts shipped from the plant 

will be shipped at the customer's expense. Machines requiring warranty work must be brought to 

the manufacturing plant in 201 Chelsea Rd, Monticello, MN or to a repair facility authorized by TSI. 

!!WARNING!! 

Goods returned without an RGA will be refused. A Returned Goods Authorization 

form must be obtained before returning any material or goods. All non-warranty returns will be 

subject to a 15% restocking fee plus any additional charges for reconditioning/repacking. 

Warranty and Return Policy

Copyright © 2021 Tire Service International, LLC

No part of this manual may be reproduced without 

specific approval from Tire Service International, LLC.

Содержание TC-125

Страница 1: ... us for any assistance 800 223 4540 Tire Service International LLC 3451 S 40TH ST PHOENIX AZ 85040 Office 602 437 5020 Email sales buytsi com Fax 602 437 5025 Read this manual before operating TC 125 TIRE CUTTER Revised January 2022 ...

Страница 2: ...Instruction 1 The machine instrument panel includes the key switch along with indicator lights Turning the key to the right activates the digital display Follow on screen directions for starting 2 Throttle control increases or decreases engine speed DO NOT operate beyond 3 4 throttle speed 1 The hydraulic oil reservoir should be filled 2 to 3 inches from the top If you add or change the fluid use ...

Страница 3: ...er to positioned in the center of the cutting table 5 Using center hydraulic control lever move tire push pull bars firmly against the tire By operating the lever on the left move shear arm down to begin the shearing process 6 Continue to shear tire all the way through Some additional adjustment may be done to the push pull bars during the shearing to maintain pressure or position on the tire 7 NO...

Страница 4: ... press the push pull bars firmly as some adjustment may be required during shearing process 8 By using the tire cut lever on the left begin to shear tire 9 Continue to shear tire making adjustments to the push pull bars as required 10 Push pull bars are moved rearward to ease rotation of the tire for the next shear 11 With the shear blade up and the push pull bars moved rearward rotate tire on rol...

Страница 5: ...ews 5 NOTE Fluid should be changed completely every two years or if contaminated by foreign matter Filter should be replaced when fluid is changed 6 Follow manufacturers engine instruction manual for all engine service recommendations 7 Zero Clearance adjustment procedure With the shear blade in the full down position and the engine off loosen the cap screws on bed shear bars both sides By checkin...

Страница 6: ...0171 Gauge Sight for Reservoir 3019 4000 Gauge 2 5 Dia x 1 4 NPT 3851 Jack Sidewind 7 000lb 4618 Male Shear Blade top 4389 Needle Valve 3 000psi 10020A Oil Filter Assembly 10152 12V Oil Cooler Assembly 4617 Pin Fulcrum 2 5 Dia x 17 4622 Pin 1 5 Dia x 6 10642 Pin 1 5 Dia x 11 25 4819 Pump Gear Hydraulic 4823 Valve 3 spool 45 GPM 1444 Wheel Tire Assembly 4 10 x 3 5 x 4 ...

Страница 7: ...ight 6 800 lbs Power Diesel 49 6 hp Kubota Cylinder Bore Stroke 6 x 48 with 79 168 lbs of force Pull Cylinder 2 5 x 16 Lift Cylinder 2 x 6 Hydraulic Oil 29 gallon SAE 20 or 30 Automatic Transmission Fluid System Pressure 2 800 psi maximum Pump 45 gpm Additional Notes ...

Страница 8: ...d repairs additions and or alterations automatically cancel this warranty and relieves TSI of any obligation Cheetah tanks claimed to be defective while under warranty will be evaluated at our manufacturing plant and either repaired if possible or exchanged and returned or credit issued to the customer account at our discretion Damage resulting from dropping the tanks will not receive warranty con...

Отзывы: